Laserfiche WebLink
high-torque drill rig. Soil boring procedures were performed as outlined in the AGE-prepared Work <br /> Plan Addendum -June 2001, and as approved by the EHD by letter dated 12 June 2001. <br /> On 14 January 2002,AGE completed a Sensitive Site Survey report and submitted to EHD. <br /> Ground water monitoring was not performed June 2002 to August 2005. <br /> On 29 June 2005, EHD directed ground water monitoring to continue. In September 2005, at the <br /> ground water monitoring recommenced at the site.From September 2005 to June 2006,four ground <br /> water monitoring events were performed; no constituents of concern were reported in the ground <br /> water samples collected from�pund water monitoring wells MW-1 through MW-3 and domestic <br /> well DW-1. ����/kp�i ZtiC IJ c,l� <�r yG, `y�Cd�fj�v <br /> UU J f alb 7rpv/y -ao.. i/L <br /> REFERENCES a YPIJ N^ /z/a 6 a- 3I a <br /> ?/lbl0) <br /> California Division of Mines and Geology, 1981. Regional Geologic Map Series, Sacramento <br /> Quadrangle. <br /> Olmsted,F.H.,and G.H.Davis, 1961,Geologic Features and Groundwater Storage Capacity of the <br /> Sacramento Valley, California,U.S. Geological Survey Water Supply Paper 1497, 24lp. <br />