Laserfiche WebLink
8. a Des�rii e t method that will be utilized to purge andlor inert the tank(s): <br /> / <br /> b. Tank/Piping Hauler. r1 <br /> Name //r <br /> elp <br /> Address City Zip <br /> Phone No{ ) <br /> Hauler Registration M(1f hauled as hazardous) <br /> c. <br /> Tank/Piping Disposal Site: <br /> Name //� G/P <br /> Address City ZiP <br /> Phone No.( ) <br /> EPA IDM(if transported to a permitted TSD facility) <br /> 9. is the sampling firm an independent third party from the contractor? YES pJ- NO(] <br /> 9a. Describe,In detall,how the soil andlor wa r s ple(s)beneath the tank and piping will be obtained: <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> e-A <br /> 11. Handling of excavated soli <br /> a)What N /fes maateriianal will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> c)Contaminated Sall Hazardous Waste Hauler. <br /> Name A��jT Hauler Registration N <br /> Address City zip <br /> Phone No. ) <br /> EH 23 046(Revised 10119198) Page 5 <br />