My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
23987
>
3500 - Local Oversight Program
>
PR0544915
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:02 PM
Creation date
10/3/2019 8:08:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0544915
PE
3528
FACILITY_ID
FA0003884
FACILITY_NAME
GOLDEN EAGLE AVIATION INC
STREET_NUMBER
23987
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
23987 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KFILL EXCAVATION CERTIFICATE* <br /> Project Location <br /> Phone No. <br /> Owner <br /> Contractor Phone No. License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g.; load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(112) inch in diameter <br /> _ B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> ackfill if contact <br /> the backfillnmaterial and tanks/pipes made of poly t. (Use of crushed rock will not be sresin glass or rmitted for similarr materials.)will be made between <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submined within 30 days of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five ian cubic yards per m B ,ganon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> ame rm[ <br /> nit e rmt <br /> ignamre <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> WI� <br />
The URL can be used to link to this page
Your browser does not support the video tag.