Laserfiche WebLink
APPENDIX VIII-D <br /> SUMMARY OF MITIGATION MEASURES <br /> Briefly describe each mitigation measure and indicate, by checklist number <br /> and letter, the mitigated impact(s) . <br /> 1 . Mitigation Measure <br /> Excavated materials will be covered with plastic during <br /> temporary staging prior to disposal . <br /> Checklist Number and Letter <br /> 2 . a: (prevent substantial air emmissions or deterioration of <br /> ambient air quality) <br /> 3 .e ._ (prevent discharge of excavated materials into surface <br /> waters) <br /> 10 . a . (prevent upset conditions caused by wind or rain) <br /> 1 . 17 . a . (protect human health by 'preventing accidental contact <br /> with excavated materials) <br /> 2 . Mitigation Measure <br /> Workers who may come into direct contact with the materials <br /> to be excavated will beadvised of the hazards associated with <br /> exposure to elevated levels of nickel and zinc . They will <br /> also be provided with protective clothing and equipment such. <br /> as disposalbe coveralls and dust mask. <br /> Checklist Number and Letter <br /> 17 .b. (protect human health by preventing workers from ingesting <br /> materials that may contain elevated levels of nickel _ <br /> . —. and zinc) <br /> i <br /> DRAFT -14- February 1988 <br />