My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1220
>
2900 - Site Mitigation Program
>
PR0009056
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 9:07:45 AM
Creation date
10/3/2019 8:43:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009056
PE
2960
FACILITY_ID
FA0004059
FACILITY_NAME
LODI DOOR & METAL CO
STREET_NUMBER
1220
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
1220 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIEORNIA�EALTM AND WE LF ARE A <br /> GE U[MEJIAN Go.«nr <br /> t DEPARTMENT OF HEALTH SERVICES <br /> TOXIC SUBSTANCES CONTROL PROGRAM ,. <br /> REGION 1 <br /> 10151 CROYDON WAY <br /> SACRAMENTO, CA 95627 <br /> (916) 665-7700 <br /> November 30, 1989 <br /> Mr. Alan R. Bashor <br /> Vice President-Human Resources <br /> Dallas Corporation <br /> 6750 LBJ Freeway - 75240 <br /> P.O. Box 809046 <br /> Dallas, TX 75380-9046 <br /> Ir <br /> Dear Mr. Bashor: <br /> OVERHEAD/LADI DOOR COMPANY, EPA I.D. #CAD009174673 <br /> I have received your letter of October 19 , 1989 outlining the <br /> schedule of upcoming events at the subject facility. I <br /> appreciate your quick response to my request at the October <br /> 17 , 1989 meeting. The schedule is satisfactory. <br /> Upon receipt of the letter I contacted Brian Pletcher of <br /> Remediation Services to ask for the date of sidewall sampling. <br /> As he did not have an exact date, I asked to be called as soon <br /> as the date was selected. I received a message on November 1, <br /> 1989 from Brian stating that sampling would occur that day. I <br /> was unable to go to the site because of prior commitments. In <br /> the future, DHS and RWQCB staff shall be notified at least 48 <br /> hours before any sampling event. <br /> I have reviewed the December 5, 1986 Final Closure Plan for <br /> Overhead/Lodi Door Company and the April 1988 revision, and <br /> have also done a quick review of the files which contain <br /> correspondence and some analytical results. As a result of <br /> this review I have several suggestions. <br /> 1) I believe a new Closure Plan which contains the pertinent <br /> background information from the old 1986 CP and updated <br /> analytical results would be the best approach to obtain <br /> our final CP approval. The 1986 CP is so outdated that <br /> it could be very confusing to a reviewer during the <br /> public review stage. The 1988 revision does clear up <br /> some questions but it also created its own questions. We <br /> believe our final CP review and approval should be based <br /> RIt_ UE1 <br /> DEC 1 Sd9 <br /> ENVIRONMENTAL HEALTH <br /> PERM IT/SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.