My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1220
>
2900 - Site Mitigation Program
>
PR0009056
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 9:07:45 AM
Creation date
10/3/2019 8:43:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009056
PE
2960
FACILITY_ID
FA0004059
FACILITY_NAME
LODI DOOR & METAL CO
STREET_NUMBER
1220
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
1220 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S'PYUE OF CALIFORNIA Aga GEORGE DEUKMEJIAN.Governor <br /> CALIFORNIA REGIONAL WATT QUALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROAD <br /> SACRAMENTO,CA 95827-3098 <br /> 25 May 1988 MPS 2b ���tN <br /> James <br /> Harvey <br /> Safety andPollution Control Officer �NVQ(`RMjNf �cR�\G <br /> Dallas Corporation <br /> 6750 L&7 Freeway <br /> Dallas, TX 75240 <br /> REVIEW OF HAR FOR OVERHEAD/LODI DOOR CO. , SAN JOAQUIN CO. , <br /> TPCA # 05114 <br /> Enclosed are our comments on the Hydrogeological Assessment <br /> Rerort (HAR) for the Dallas Corporation, dba, Overhead/Lodi Door <br /> Co. (O/LDC) surface impoundment. <br /> Much of the work necessary to satisfy HAR requirements in Section. <br /> 25208. 8 of the California Health and Safety Code has been <br /> completed. The comments in the attached memorandum must be <br /> addressed, and additional work performed to complete the HAR, <br /> including but not limited to the following: <br /> 1. Obtain valid analytical results for major ionic constituents <br /> from all wells. <br /> 2. Investigate the entire vertical extent of the upper aquifer. <br /> 3 . Determine the nature of interconnection between the <br /> uppermost water-bearing zone and deeper aquifers. <br /> 4 . If a lack of interconnection cannot be adequately <br /> demonstrated, investigate the effect of the impoundment on <br /> deeper water-bearing zones. <br /> 5. Install additional wells to more accurately monitor down- <br /> gradient water quality. <br /> 6. Determine the magnitude of vertical gradients in the <br /> uppermost water bearing zone. <br /> 7 . Obtain accurate estimates of aquifer properties by <br /> performing aquifer hydraulic tests. <br /> In addition to the work necessary to complete the HAR, the <br /> lateral and vertical extent of ground water ;which has been <br /> affected by leachate migration must be investigated, and <br /> remediation alternatives assessed. It would be advantageous to <br /> coordinate these two goals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.