My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
23987
>
2900 - Site Mitigation Program
>
PR0543879
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 9:55:10 AM
Creation date
10/3/2019 10:39:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543879
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024951
FACILITY_NAME
LODI AIRPORT
STREET_NUMBER
23987
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00517007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23987 N STATE ROUTE 99 ACAMPO 95220
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WELL COVER <br /> CONCRETE APRON <br /> LACKING CAP <br /> BLANK 40 PVC CASING (SCHEDULE. 40) NEAT CEMENT 0.5-60 FEET <br /> 0-65 FEET <br /> BENTONITE PLUG, 60-63 FEET <br /> 0.020 SLOTTED PVC SCREEN (SCHEDULE 40) FILTER PACK (#2/12 SAND) 63-65 FEET <br /> 65-86 FEET - <br /> PLUG <br /> TYPICAL MONITORING WELL DESIGN a-x0x =VAMm <br /> ALL DEPTHS RELATIVE TO SURFACE GRADE. <br /> NOT TO SCALE <br /> Stephen G. Muir <br /> Consulting Geologist&Geophysicist <br /> Golden Eagle Aviation Lodi Airport <br /> 23987 NoM Highway 99,Acampo California <br /> Groundwater Monitoring Well <br /> Completion Schematic <br /> Source: AGE (2000) June2018 Fig. A2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.