My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
23987
>
2900 - Site Mitigation Program
>
PR0543879
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 9:55:10 AM
Creation date
10/3/2019 10:39:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543879
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024951
FACILITY_NAME
LODI AIRPORT
STREET_NUMBER
23987
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00517007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23987 N STATE ROUTE 99 ACAMPO 95220
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,l <br /> ,ww <br /> LN <br /> Tylor McMillan's Well Service, LLC <br /> SOP Well Blasting <br /> 1. Setup "No Cell Phone or Radio Use" signage when using Electric Initiation Systems. <br /> 2. Ground and Bond vehicles to a grounded source when using static discharge sensitive <br /> explosive materials. <br /> 3. Check the site for immediate hazards around each well to be destroyed. <br /> 4. Tag the depth of the well to be loaded to ensure that the current depth is the same as <br /> the reported depth on the Blast Plan. <br /> 5. Clear the area of unnecessary personnel before prepping the charge. <br /> 6. Open the day box and remove the products to be used. <br /> 7. Assemble the charge for the well. <br /> 8. Return extra products to the day box. <br /> 9. Lower the charge into the well, pay close attention to ensure the charge is set in the <br /> proper place down hole. <br /> 10.Secure the charge at the surface. <br /> 11. Bring in only the personnel required to grout the well. <br /> 12. Begin the grouting process <br /> 13. Carefully monitor charge placement in the well while grouting to ensure the charge <br /> doesn't float to the surface. <br /> 14.After grouting is complete, clear the grouting personnel from the exclusion zone. <br /> 15. Place containment method over well and secure. <br /> 16. Setup and ready the seismograph. <br /> 17. Clear the exclusion zone and shut down any roadways or sidewalks located within the <br /> exclusion zone. <br /> 18. Double check the area to ensure no stragglers have entered the exclusion zone. <br /> 19. Sound the pre-fire signal <br /> 20. Issue verbal pre-fire warning and begin countdown from 5 <br /> 21. FIRE IN THE HOLE!! Detonate charge. <br /> 22. Sound Post-fire signal <br /> 23. Check the seismograph for confirmed trigger if the charge is not physically or audibly <br /> noticeable as detonated. <br /> 24. Remove the containment device <br />
The URL can be used to link to this page
Your browser does not support the video tag.