Laserfiche WebLink
O I� <br /> O r <br /> 0 4 a <br /> NOTES: o <br /> 1 . EXISTING TEMPORARY GENERATOR SET � <br /> TO REMAIN UNTIL FINAL INSTALLATION AND <br /> ACCEPTANCE OF NEW PERMANENT 4� s <br /> GENERATOR SET. CONTRACTOR TO PROVIDE (E) ELECTRICAL RM. S w <br /> 2ND TEMPORARY GENERATOR AS REQUIRED. T N <br /> 2. BACKFILL, PATCH AND REPAIR EXISTING w <br /> PAVEMENT DAMAGED FROM CONSTRUCTION. Y Q <br /> EMOVE (E) UPS POWER SUPPLY - N <br /> w � N <br /> 3. PROVIDE GENERAL SITE CLEAN UP. SYSTEM. SEE ELECTRICAL. REMOVE <br /> OR GRIND FLUSH ANCHORS TO SLAB. o a a w <br /> W. C E N T E R S T. PATCH & CLEAN (E) FLOOR AND . . . . <br /> WALLS TO MATCH ADJACENT . . . . . . <br /> . . . . . . <br /> . A <br /> I <br /> 20'-0" 32`-0" (E) ELECT. BOX AND �\ <br /> I ' <br /> E) DRIVEWA (E) DRIVEWAY CONDUIT <br /> I <br /> I <br /> a <br /> - - - - - - - - - - - - - - - - - - - - <br /> (E) SIDEWALK 4 o w <br /> m o <br /> I o o O N <br /> I 3,_6,> 5 6 - - - - - - , <br /> c— 0 0 <br /> 6 1 6" w <br /> 16'-213" '" 4'-3" 2'-818» 1�» 3'-4" h--� <br /> I I MAIN ENTRANCE® <br /> � 2 <br /> 3 <br /> Baa <br /> AIR <br /> O o 0 � <br /> C) < w AIRPLA <br /> z I I a 9 I ►--� U <br /> • • U <br /> °O m GENERATOR AIR DAY A-3 <br /> WT. = 1 5 6 <br /> w <br /> z oA z <br /> � Y Y C3 in ;> <br /> Li <br /> ® Io 3 7 <br /> co 5 g N LO <br /> 1--r <br /> Z 13cl <br /> a' <br /> - - - I o <br /> 11 <br /> \ e FIELD VERIFY BEST OCATION z a a <br /> \ FOR ITEMS gANDg <br /> J I <br /> 5 6 28'_11 " (E) CONC. PAD p ' <br /> (E) HVAC <br /> I EQUIPMENT YARD I - - - - - - - - - - - - - - - - - -� <br /> A' I I I (E) UNDERGROUND DOUBLE (E) CONC. SLAB z <br /> �O - - t I WALL DIESEL TANK I <br /> 0 0 0 I I W <br /> 5 g <br /> - - - - <br /> � <br /> IPE z <br /> N w <br /> S RECEIVES: <br /> REFERENCE NOTES: z <br /> AUG 312015 daa <br /> O (N) 500kW DIESEL GENERATOR WITH SOUND O PATCH AND REPAIR (E) CONCRETE AND ASPHALTIC 12 NEW LOCATION OF RELOCATED STROP LIGHTS, W <br /> ATTENUATED ENCLOSURE, WT. = 13,000 LBS. PAVEMENTS, DUE TO DEMOLITION AND NEW WORK, TO ALARMS AND PANELS FOR FUEL TANK, PROVIDE �A T <br /> SET ON (E) CONCRETE SLAB, SEE('--*). <br /> MATCH ADJACENT CONDITIONS. 3"X3"X1/4" GALV. TUBE POSTS IN CONIC. ENVIRONMENTAL, N <br /> AREA OF WORK A 3 FOOTING SIM. TO g !��A!Tu�eopoT�neniT q w <br /> I <br /> (E) TRASH I O TRANSFER FUEL/DAY TANK, WT. = 3,508GROUN LBS. SET <br /> O FILL PORTIONS OF (E) TRENCH W/ 2,500 PSI <br /> CONIC., EXCEPT AT NEW FUEL PIPE VAULT BOX, <br /> ENCLOSURE ON (E) CONC. PAD. SEE(-5AND PLUMBING SEEe AND PLUMBING. 18 FIELD VERIFY LOCATION OF FIELD LINE ENTRY _ } <br /> TO GENERATOR. PROVIDE 10 GA. G.I. COVER E- <br /> FOR NEW WORK, SEE DWGS. A_3 A-3 TO PROTECT FUEL LINES BETWEEN DAY TANK <br /> — — — — — — — — — — MODIFY EXISTING FUEL PIPE VAULT AND METAL COVER AND GENERATOR ENTRY POINT. FIELD ." C r} ;;�lFr; O W <br /> 3 DETERMINE EXACT CONFIGURATION. 1' T .Z) <br /> O AT THIS END OF (E) TRENCH., SEE PLUMBING. O NOT USED T� m <br /> PROPERTY LINE 115.28' f 1 w A "' <br /> 4O (N) LOCATION OF 39"WX26"D ELECTRICAL TAP BOX 11 NC" z <br /> FOR PORTABLE GENERATOR CONNECTION, SEE 7 O F <br /> ELECTRICAL DWGS. PROVIDE 42W X 30"D CONIC. O NOT USED ,71C ;!'-N w �5 t 7 Ia Z U <br /> PAD. SEE ip \ _ Z O W <br /> A_3 A /.V <��,., E- d U <br /> I= PQ w <br /> w E- H <br /> O CONTRACTOR SHALL CAREFULLY LOCATE (E) 10 NOT USED C) Z Z <br /> NORTH UNDERGROUND ELECTRICAL CONDUITS AND FUEL d PQ <br /> LNES TO PERFORM DEMOLITION AND NEW WORK <br /> NORTH <br /> THAT ARE REQUIRED TO BE RECONNECTED TO 11 NEW (2) 6" CONC. FILLED BOLLARD. SITE -D z <br /> EXISTING FUEL LINES AND CONDUITS. o <br /> LOCATE TO ALLOW ELECTRICAL FRO y z O <br /> CLEARANCE REQUIREMENTS. SEE 6 <br /> a w doe No. 40219.01 <br /> A-3 o > <br /> w o w <br /> Lje� DATE 11 -19-14 <br /> Baa <br /> PLOT PLAN — SHOWING NEW CONDITION 1 "=20'-0" 12 PARTIAL PLOT PLAN — NEW WORK 1/4"=1 '-0" 4 w � — <br /> A � <br /> o <br />