My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 3:15:27 PM
Creation date
10/3/2019 11:29:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment Assessment Page A: <br /> Overh4a view: <br /> Cross sectional (lateral)view: <br /> °0 <br /> Volume calculations: <br /> Tank volume(largest tank): 7,400 gallons. <br /> Containment volume(sum of areas 1,2&3)— 14,363 gallons(gross) <br /> Less tank volume_376 gallons,containment volume= 13,987 gallons(net) <br /> Volume/inch= 13987 gal/24 in= 582.8 gal/in <br /> Excess volume= 13987-7400 gals. equivalent to 6587 gal/582.8 gal/in = 11.3 in <br /> 24 hr.,25 yr. storm=2.4 to 2.6"for most of San Joaquin Valley. <br /> Therefore,secondary containment volume is adequate. <br /> Design of containment area: Secondary containment is provided by a number of areas <br /> enclosed by poured concrete, or concrete block walls with re-bar. The containment area <br /> does not have cracks or gaps to allow the escape of spilled material. Area 1 (East end) is <br /> connected to area 2 by an open 6 in. pipe,and area 2 is connected to area 3 (West end)by <br /> a 6 in. pipe. <br /> Site Security: The entire site is fenced. The gate is locked when company personnel are <br /> not present. <br /> Secondary Containment findings:The secondary containment system is of sufficient <br /> capacity and condition for the containment of releases from the 7,400 gallon wastewater <br /> tank and ancillary equipment. Initials: %S <br /> California Tank Lines,Inc. Wastewater Processing'Tanks(3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.