My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 3:15:27 PM
Creation date
10/3/2019 11:29:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Company: Mike Smith Engineering,Inc. _ Date: 7/24/2017 <br /> Anchor Designer TM Engineer: Mike Smith Page: 5/5 <br /> t , Software Project: Cal Tank lines-17174 <br /> Version 2.5.6554.3 Address: <br /> Phone: <br /> E-mail: <br /> 12.Warnings <br /> -When cracked concrete Is selected,concrete compressive strength used In concrete breakout strength in tension,adhesive strength in tension <br /> and concrete pryout strength In shear for SET-XP adhesive anchor Is limited to 2,500 psi per ICC-ES ESR-2508 Section 5.3. <br /> -Minimum spacing and edge distance requirement of 6da per ACI 318 Sections D.B.1 and D.8.2 for torqued cast-In-place anchor is waived per <br /> designer option. <br /> -Brittle failure govcros for tension.Governing anchor failure mode Is brittle failure.Attachment shall be designed to satisfy the requirements of <br /> ACI 318-11 Section D,3.3.4.3 for structures assigned to Seismic Design Category C,D.E,or F when the component of the strength level <br /> earthquake force applied to anchors exceeds 20 percent of the total factored anchor force associated with the same load combination.In case <br /> when ACI 318-11 Sections 0.3.3.4.3(a)3 to 6,(b),(c),or(d)Is satisfied for tension loading,select appropriate checkbox from Inputs tab to <br /> disable this message.Alternatively,00 factor can be entered to satisfy ACI 318.11 Section D.3.3.4.3(d)to Increase the earthquake portion of tho <br /> loads as required. <br /> Per designer Input,ductility requirements for shear have been determined to be satisfied—designer to verity. <br /> Designer must exercise own judgement to determine If this design Is suitable. <br /> Refer to manufacturer's product literature for hole cleaning and installation Instructions. <br /> Input dmfs and results must bo ehadted for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility. <br /> Simpson Strong-Tie Company Inc. 5956 W.Les Posites Elouievard Pleasanton,CA 94538 Phone:825.560.9000 Fax:825.847.3871 www,strongtio.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.