My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 3:15:27 PM
Creation date
10/3/2019 11:29:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_-' ENVIRONEERING INC. <br />V;iv Process Engineering, Water Reuse, and Accident Prevention <br />April 9, 2010 <br />Mr. R. Von Flue <br />Environmental Health Department <br />San Joaquin County <br />600 E. Main Street <br />Stockton, CA 95202-2708 <br />Dear Mr. Von Flue: <br />APR 12 cu.0 <br />ENVIRONMENT HEALTH <br />PERMIT/SERVICES <br />This will confirm our telephone conversation on 4/5/10, in which I advised you <br />that California Tank Lines had removed the two cone bottom tanks from the <br />pretreatment system at their S. El Dorado St. terminal, and would proceed to <br />empty them of solids, prior to removing the tanks from the containment area. The <br />solids will, of course, be disposed of in keeping with applicable regulations. <br />Meanwhile, Environeering will proceed to prepare a Tank and Containment <br />Assessment covering the remaining wastewater storage tanks and containment <br />area. Before this can be completed, however, a few modifications to the piping <br />and containment walls must be made. The tanks are anchored as required to meet <br />seismic requirements, so this short delay will not present a risk to employees or <br />neighbors. <br />Thank you for your patience and understanding of this situation. We will advise <br />you immediately should anything arise to delay completion of this assessment. <br />Sincerely, <br />,4-e/V . <br />P. . <br />G. W. Roy, <br />c.c. Jack Bishop <br />P. O. Box 2498, Danville, CA 94526 • (925) 838-1763 Fax (925) 838-9621 <br />
The URL can be used to link to this page
Your browser does not support the video tag.