My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 3:15:27 PM
Creation date
10/3/2019 11:29:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
----- Calron Syelcmr.,Inc- Cert #3741-1484-4570 <br /> CA ►LCON <br /> 12919 R mon,a A.,9 Ste.9 <br /> �/ San Ramon,CA.,9a5H6 <br /> SYSTEMS (996)P77.0665 Job# 4690 <br /> www.calcon.com <br /> Calibration / Verification Certificate <br /> CUSTOMER <br /> California Tank Lines Inc. <br /> MANUFACTURER MODEL SERIAL NUMBER <br /> PARTLOW 51000031 45060877 <br /> TYPE LOOP NUMBER SERVICE DESCRIPTION <br /> CHART RECORDER DISCHARGE TANK 3 <br /> RANGE DATA INPUT OUTPUT DISPLAY <br /> LOW 4 PH 4 PH 4 PH <br /> HIGH 14 PH 14 PH 14 PH <br /> SPAN 10 PH 10 PH 10 PH <br /> Data & Check-Out Parameters <br /> SIMULATED INPUTIINITIAL CHECK FINAL CHECK <br /> PERCENT INPUT OUTPUT ERROR DISPLAY DISPLAY PERCENT INPUT OUTPUT ERROR DISPLAY DISPLAY <br /> ERROR ERROR <br /> 0.00% 4 4 0.00% 4 0.00% 0.00% 4 4 0.00% 4 0.00% <br /> CALIBRATION EQUIPMENT <br /> Fluke milliamp source <br /> NOTES <br /> Chart recorder and pen calibrated to manufacturer's recomendations <br /> NEXT CALIBRATION DUE:Sep 11, 2017 <br /> PERFORMED BY:: Eli Barton <br /> Jun 30, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.