My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2200 - Hazardous Waste Program
>
PR0505946
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 2:51:52 PM
Creation date
10/3/2019 2:41:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505946
PE
2227
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5eistnic/Anchoring: <br /> Tank anchorage is specifically designed for linear and crosslinked polyethylene tanks, and <br /> consists of bolts or metal clips amchomd to the concrete foundation pad,with cables running <br /> between the clip and hold downs on the top of the tank. These are desigmed by a civil/structural <br /> engineering fpm., and are purchased from the tank manufacturer, Snyder Industries or Poly <br /> Processing Co. The system for the wastewater cone bottom tank is shown in the attached signed <br /> and stamped drawings. <br /> Seismic/Anchoring findings: The tanks as designed and operated,and the containment areas in which <br /> they are located,are adequately anchored and are seismically sound. <br /> Initials:,, <br /> 0 <br /> Leak Test: <br /> A leak test was conducted by filling the tanks with wastewater and inspecting for leaks. There <br /> were no signs of leakage. <br /> Tank Integrity: Based on the fact that the tanks are new(purchased in 2016)and have contained <br /> wastewater without signs of leakage,the tanks have sufficient integrity for their intended use- <br /> Tank Drawing, - <br /> �IAsUu��tft <br /> Facing <br /> N E S W <br /> Tank Diameters-. l i ft 10 in,4 ft and 4 ft <br /> Tank I3eight: 15 ft 3 in, 5 ft 7 in and 4 ft <br /> Tank Gross Capacity.- 8255 gallons <br /> California Tank Lincs, Inc. Wastewater Processing Tanks(3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.