Department of Public Works prior to the start of excavation and every five years thereafter. <br /> If it is determined necessary by the Department of Public Works during the excavation, the <br /> applicant shall construct an acceleration land and/ or a left-turn lane on Waverly Road to <br /> permit safe egress and ingress from the site. Road construction and design shall be <br /> subject to approval by the Department of Public Works. The applicant shall pay fees for <br /> the plan-check, inspection, and construction cost. <br /> f. A bond or cash deposit in the amount acceptable to the Department of Public Works shall <br /> be filed with the Department with a guarantee that if the permittee fails, refuses, or neglects <br /> to repair, under permit, any damages to Waverly Road which may result from the <br /> permittees operations, the Department of Public Works may do to the work necessary to <br /> restore Waverly Road Equal to, or better than, its original condition by using the funds from <br /> said bond or cash deposit. <br /> g. A bond or cash deposit in the amount acceptable to the Department of Public Works shall <br /> be filed with the Department with a guarantee that if the permittee fails, refuses, or neglects <br /> to reclaim the project site, the Department of Public Works may do the-work of reclamation <br /> by using the funds from the said bond or cash deposit. The progress of reclamation shall <br /> be reviewed with the Department of Public Works every five years and at the end of <br /> excavation. <br /> h. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee is $200.51 per daily trip-end in <br /> the Linden area. The fee shall be automatically adjusted annually by the Engineering <br /> Construction cost Index as published by the Engineering News Record. <br /> 3. PUBLIC HEALTH SERVICES: <br /> Ordinance Requirements: <br /> The Ordinance Requirements listed below have been identified as pertinent to this project. <br /> Other Ordinance Requirements may also apply. Ordinance Requirements cannot be modified. <br /> a. No excavation-is permitted into the ground water table without specific approval from the <br /> Regional Water Quality Control Board, Central Valley Region (California Water Code, <br /> Chapter 4, Article 3, Section 13420). <br /> b. The materials from excavation shall not be deposited into the water course nor in any way <br /> contribute to the pollution thereof(California Water Code, Section 13376)- <br /> C. <br /> 3376)c. An approved p-otable water supply must be provided for all employees (San Joaquin <br /> County Development Title, Section 9-1100.1). <br /> d. Approved sanitary facilities must be provided for all employees (San Joaquin County <br /> Development Title, Section 9-1100.1). <br /> e. Destroy the abandoned well(s) under permit and inspection by the Environmental Health <br /> Department as required by San Joaquin County Development Title, Section 9-1115.5(e). <br /> f. Before any hazardous materials/waste can be stored or used onsite, the owner/operator <br /> must report to the California Environmental Reporting System (CERS)which can be found <br /> at cers.calepa.ca.gov/for the following: <br /> Any amount of hazardous waste (for distribution centers this may include broken or <br /> damaged pallets (or individual containers) of hazardous materials, soaps, perfumes, <br /> San Joaquin County QX-91-00061Garibald i <br /> Community Development Page 9 <br />