My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011715
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
21455
>
2600 - Land Use Program
>
PA-1800030
>
SU0011715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 10:31:36 AM
Creation date
10/4/2019 11:20:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011715
PE
2637
FACILITY_NAME
PA-1800030
STREET_NUMBER
21455
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391-
APN
20945036
ENTERED_DATE
3/21/2018 12:00:00 AM
SITE_LOCATION
21455 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
3/20/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\21455\PA-1800030\SU0011715\BOS OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Purpose Plan Cassano Kamilos Homes at College Park <br /> SECTION SEVEN: IMPLEMENTATION <br /> 7.1 Introduction <br /> Providing flexibility to refrie the project throughout the process, so long as <br /> performance standards set forth above are met,is an impoItant component ofthis <br /> Special Purpose Plan. <br /> 7.2 Refinement ofProject Elements During Construction <br /> Inorder to create the bestpossible project,it is expected thatthesitingofproject <br /> elements such as,but not limited to,houses,guest parking spaces,private patios <br /> and pedestrian path locations will be checked and adjusted as appropriate in the <br /> j„prior to construction <br /> 7.3 Amendments to this Special Purpose Plan <br /> Minor modifications to this Special Purpose Plan may be permitted bythe <br /> Community Development Director without formal Plan Amendment,provided such <br /> modifications do notviolate or adversely impact other elements ofthe Special <br /> Purpose Plan. Said modifications shall be approved bythe Design Consistency <br /> Review Committee(DCRC). <br /> 7.4 Phasing <br /> 1. Project residential areas maybe developed in phases,subject to utility and <br /> access requirements,as determined by MHCSD. <br /> 2. The Linear Parkin the projectareamaybedeveloped intwo phases,Northand <br /> South,with the division at Teixeira Avenue, Improvement ofthe Linear Park <br /> segments shall be as follows: <br /> a. Construction oftheNoIthshall begin bythetimethat50%ofthebuilding <br /> permits for sub-neighborhoods D2 and D4 have been issued. <br /> b. Completionofthe North shall occurbythetime that 80%ofthe buildings in <br /> sub-neighborhoods D2 and D4 have been issued occupancy permits. <br /> c. Construction ofthe South shall begin by the time that 50%ofthe building <br /> permits for sub-neighborhoods D3,D5 and D6 have been issued. <br /> d. Completion ofthe South shall occurby thetime that 80%ofthe buildings in <br /> sub-neighborhoods D3,D5 and D6 have been issued occupancy <br /> permits. <br /> ( <br /> V:�2502 i-(P.nlficeLSiduniicnlfni]tiGAS��;cial Purpuw Plan CASMIN6 LOS UOMIi5 A COLLEA:PARI:ttu b7AcJ�5.Ju� <br />
The URL can be used to link to this page
Your browser does not support the video tag.