Laserfiche WebLink
Mr. Gabriel Gonzalez, EHS <br /> June 19, 2015 <br /> Page 3 of 4 <br /> The surfaces at all of the destroyed well locations will be restored with patches of matching asphalt, <br /> concrete or gravel pavement. <br /> Waste Management and Disposal <br /> The driller will properly contain the waste well materials and soil for temporary on-site storage, <br /> pending waste characterization and proper disposition. To characterize the waste, Ramage <br /> Environmental will collect representative soil samples for laboratory analysis. The lab will analyze <br /> the samples for petroleum hydrocarbons and total lead, so that the waste can be profiled for disposal <br /> into an appropriate landfill. Based on the existing set of soil sample analytical results, Ramage <br /> Environmental expects that the well destruction waste will be profiled and disposed of as non- <br /> hazardous waste at a nearby landfill. <br /> Proiect Report <br /> The completion of the proposed scope of work will be documented in a final report, prepared by a <br /> state of California Professional Geologist or Engineer. The report will be submitted to EHD, the <br /> Central Valley Regional Water Quality Control Board (CVRWQCB), and the state of California <br /> GeoTracker database. On behalf of the driller, Ramage Environmental will submit well completion <br /> reports documenting the well destructions to EHD and the California Department of Water <br /> Resources (DWR). <br /> Implementation Schedule <br /> Implementation of the well destructions and site restoration scope of work is pending the expiration <br /> of a 60-day case closure public participation period. In the meantime, Ramage Environmental plans <br /> to submit the well destruction permit application to EHD. As such, the well destruction and site <br /> restoration field work could be completed as early as September 2015. Allowing time to profile and <br /> dispose of the remaining waste materials, Ramage Environmental could publish the final project <br /> report by the end of October 2015. <br /> Thank you for your review of this work plan and overall assistance on this project. If you have <br /> questions or need any additional information, please call me at (775) 851-7239, or send me an e- <br /> mail at joeramage@sbcalobal.net. <br /> Sincerely, <br /> RAMAGE ENVIRONMENTAL, INC. c �oN' 9Fp' <br /> O <br /> JOSEPH C� <br /> CL R. .{ <br /> RAMAGE <br /> N� No.5856 <br /> Joseph Ramage, P.G. <br /> Sr. Geologist SOF ca��F� <br /> Expires April 30,29J <br />