•,�'• �,,I�I1NC SACRAMENTO <br /> 5.0 WORK SCHEDULE <br /> The work will be initiated following the finalization and approval of thisworkplan. <br /> The mobilization will begin immediately thereafter upon obtaining drilling permits,_ g gP , a <br /> drilling contractor, and clearance of the borehole Iocation by utility locators. Drilling <br /> and sample collection is expected to take one day. Verbal sample results will be <br /> available within 21 days after the laboratory receives the samples. <br /> } <br />