My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
503
>
2900 - Site Mitigation Program
>
PR0504770
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 4:54:59 PM
Creation date
10/4/2019 4:49:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0504770
PE
2950
FACILITY_ID
FA0006319
FACILITY_NAME
HFCC
STREET_NUMBER
503
Direction
W
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21220005
CURRENT_STATUS
02
SITE_LOCATION
503 W LARCH RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1' <br /> ILACIONSirINC. SACRAMENTO <br /> 2.0 SITE DESCRIPTION <br /> The site is currently occupied by a single-story office and warehouse bhilding. <br /> The exact construction date of the building is unknown; however, buildin ;.perrnits on file <br /> at the City of Tracy Building Department indicate the building was constructed:in the <br /> late 1970s to early 1980s with minor modifications made throughout the 1980s. :`The <br /> front portion of the building contains office and support areas while the rear of!the <br /> building houses a garage, a storage room, and a warehouse. <br /> The garage area, located on the west side of the rear portion of,the'buildin , <br /> g <br /> consists of painted plywood wall partitions and painted sheetrock walls to'a height of <br /> eight feet. A metal roll-up door and a metal walk-through door, which'-both exit into the <br /> parking lot, are located on the west side of theara e. <br /> g g <br /> The storage room, located on the east side of the rear portion of the building, was <br /> reportedly previously used as a clean room during circuit board manufacturing <br /> operations. It is likely that the fume hoods and piping were used during th;e circuit <br /> board operations. <br /> The warehouse, located at the north side- of the building, consists ofp ainted <br /> F: <br /> plywood and painted sheetrock walls, extending to a height of eight feet. The)flooring is <br /> both concrete and epoxy-coated concrete. Three metal roll-up doors and three kmetal <br /> walk-through doors are located on each exit wall. Hazardous operations signs appear <br /> d <br /> outside a small self-contained room near the east wall. The interior of the:small-room <br /> contains wooden shelves and disconnected piping. A concrete-bermed area is located in <br /> i <br /> the warehouse near the east wall and east of the small room. These berms' occur around <br /> transformers and other electrical equipment. , <br /> An asphalt-paved parking area, which is landscaped with trees and shrubs,.is <br /> located on the west side of the building. Landscaping,is also present at-the south side of <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.