My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019 TANK TOP UPGRADE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL 2019 TANK TOP UPGRADE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 11:41:53 AM
Creation date
10/7/2019 9:00:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019 TANK TOP UPGRADE
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM#149 <br /> Veeder-Root TLS-350 Monitoring System Requirements for CPM <br /> Consoles: (Must be equipped with an ECPU2 or an upgrade is required) <br /> Continuous Pressure Monitoring: <br /> • Veeder-Root TLS-350 <br /> • Veeder-Root TLS-350R Low Investment. Big Return. <br /> • Veeder-Root TLS-350 Plus A few minor equipment additions to the TLS-350 platform such as a pressure <br /> • Gilborco EMC sensor,a smart sensor module and memory expansion allows CPM to provide <br /> • Red Jacket ProMax two primary solutions.First,Continuous Vapor Leak Detection(CHH is a <br /> Memory Board: (332966-203) solution within CPM that informs station owners of the compliance status of the <br /> • A flash memory board(NVMEM 203)for software storage-installed on the ECPUII vapor containment system,whether the ulloge space is pressurized or under <br /> board in place of the console's 1/2 Meg RAM board-install as per TLS-350 Series vacuum.This feature within CPM will provide discreet alarms if performance <br /> Board and Software Replacement Manual,no setup required. drops below the required compliance level,informing station owners that the <br /> vapor space is leaking.Second,Pressure Monitoring continuously examines the <br /> Communication: pressures within the fuel tank storage space and reports on a daily and monthly <br /> • A RS-232 module is required for RS-232 access to CPM reports-install as per basis the percentage of time above the pressure limit input and the percentage of <br /> instructions shipped with module. time above atmospheric pressure.The pressure limit input is calculated manually <br /> Probes: by testing the P/V valve and input into the CPM system at 0.5"WC below the <br /> • One V-R Mag probe in each of the gasoline tanks being monitored-install as per site-determined cracking pressure. <br /> installation manual shipped with device,setup following instructions in TLS-3XX <br /> Setup Manual. Pressure Monitoring <br /> �— <br /> (P/V Venting) <br /> Smart Sensor Module:(Either 7 Channel:332250-001 or 8 Channel:329356.004) Pressure Sensor <br /> • Smart Sensor module is required to monitor Vapor Pressure Sensor(up to 8 devices per Enclosure <br /> module,or 7 9 customer is using SmartSensor module/embedded pressure).Install <br /> and connect following instructions in the Vapor Pressure Sensor installation Guides. continuous vapor <br /> Leak Detection <br /> Pressure Sensor:(330020-630) ; <br /> • Vapor Pressure Sensor(one per site)-install as per Pressure Sensor installation manual <br /> shipped with sensor. <br /> Software Enhancement Module (SEM) (330160-XXX) <br /> • Activates CPM software technology compliance information,obtain inventory and <br /> delivery information,and access site history and analytics. <br /> Stage II Decommissioning Options&Manual Test Schedules <br /> Option At Time of Monthly Quarterly Annually Every 3 Years <br /> Decommissioning <br /> Install(PMPressure Decoy Test None None None DecayPressure <br /> (Per EPA NESH <br /> Inspect fill and Stage I Swivel adapters to be sure If the annual test is Pressure Decay Test <br /> they are tightly sealed. failed(meaning (without any <br /> Visually inspect Stage I dry breaks to be sure corrective action was corrective action <br /> they are tightly sealed. needed on the day of taken before or <br /> Decommission Pressure Decay Test the test),quarterly during the test on the Pressure Decay Test <br /> without CPM Check ATG caps to be sure they are tightly sealed and that testing shall be required day of the test)and a (Per EPA NESHAP 6C) <br /> the associated electrical grommets and vent extractor caps and annual testing shall P/V valve test. <br /> are in good working order. resume upon passing <br /> four(4)consecutive <br /> Visually inspect the Riser and P/V valve and cap for damage quarterly tests. <br /> visible from the ground level. <br /> To learn more,contact us at 888.561.7942 or visit www.veeder.com <br /> 125 Powder Forest Drive, P.O. Box 2003,Simsbury, CT 06070 USA,©2015 Veeder-Root Company �`� VEEDER—ROOT <br />
The URL can be used to link to this page
Your browser does not support the video tag.