My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011322
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
3500 - Local Oversight Program
>
PR0544922
>
ARCHIVED REPORTS XR0011322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:36:29 PM
Creation date
10/7/2019 3:29:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011322
RECORD_ID
PR0544922
PE
3528
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
02
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br /> Mr Kenneth Earnest <br /> i April 24, 1995 <br /> Page 2 <br /> During this reporting period, the ground water extraction system pumped continuously and <br /> extracted 16,235 gallons of water from monitoring well MW-3. As of January 26, 1995, the <br /> ground water extraction system extracted a cumulative total of 153,799 gallons from monitoring <br /> well MW-3 <br /> January 26 to February 23, 1995 <br /> After replacement of carbon on February 15, 1995, the vapor extraction system ran continuously <br /> through February 23, 1995 The vapor extraction system extracted an estimated 77 pounds of <br /> hydrocarbons (based on field readings) Laboratory analysis for the influent bag sample <br /> collected on February 15, 1995, was nondetect for benzene. The resulting estimated benzene <br /> extraction was 0 0 pound Therefore, as of February 23, 1995, the cumulative totals for <br /> extraction amounts since start-up of the system were 12,858 pounds for hydrocarbons and 211 <br /> pounds for benzene. <br /> For this reporting period, the ground water extraction system pumped continuously and extracted <br /> 16,152 gallons from monitoring well MW-3 As of February 23, 1995, the cumulative ground <br /> water extraction total was 161,951 gallons <br /> February 23 to March 13, 1995 <br /> The vapor extraction system ran continuously from February 23 to March 2, 1995. The system <br /> was shut down on March 2, 1995 and restarted on March 13, 1995 The vapor extraction <br /> system extracted an estimated 56 pounds of hydrocarbons (based on field readings). Laboratory <br /> analysis for the influent bag samples collected on March 2 and 13, 1995, was nondetect for <br /> benzene The resulting estimated benzene extraction was 0.0 pound Therefore, as of March <br /> 13, 1995, the cumulative extraction totals remain at 12,914 pounds for hydrocarbons and 211 <br /> pounds for benzene <br /> For this reporting period, the ground water extraction system extracted 10,118 gallons from <br /> monitoring well MW-3, bringing the cumulative ground water extraction total to 180,069 <br /> gallons. <br /> ACTON• <br /> MICKELSON- <br /> van DAM,INC Upt182 mj <br /> Consulting Scientists, Engineers,and Geologists <br />
The URL can be used to link to this page
Your browser does not support the video tag.