Laserfiche WebLink
INITIAL DISCREPANCIES and CORRECTIONS <br /> 1. Require Overfill Alarm per Title 22-battery operated signal coil and alarm available to place <br /> on existing popup gage,no outside wiring required <br /> 2. Some"legacy drainage'from suction transfer pipe inserted in now plugged interstitial <br /> opening <br /> 3. Replace PVC shipping plugs with metal plugs on top <br /> 4. Maintain Weekly Inspection record on site <br /> vo <br /> 7 so VT <br /> ��S5 u <br /> 1 '4:a: 1i4 <br /> • C r.r`� <br /> Y <br /> COVEY AUTO EXPRESS,INC. Interior Shop 480 GA Lube Cube Used Oil AST 1/21/14 DKB <br /> Please note:Fill Funnel(far end),Emergency Relief Vent port(presently closed with PVC plug), <br /> and Normal Vent(foreground)is plugged.Adjacent plugged 2 IN opening into interstitial void <br /> should remain plugged. However,all PVC plugs should be metal.Product level may be monitored <br /> with existing plastic Float Activated Gauge(right foreground).Gasket is intact in 6 IN fill port <br /> (center foreground)depressed screen insert is suggested. <br />