Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard D Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure Vacuum l Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen I ALIipment Resolution: 1/10-15 Psi <br /> Piping Run# 1 Piping Run#2 Piping Run#3 Piping Run #4 <br /> Piping Material: fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: Approx. 175' Approx. 175' Approx.8' Approx. 175' <br /> Product Stored: Regular 87 Regular 87 Regular 87-Sphion Super 91 <br /> Method and location of Test boot at STP Test boot at STP Test boots at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sumps#1&2 Piping Sump#3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:15 8:55 9:00 9:05 <br /> Initial Reading(Ri): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:15 9:55 10:00 10:05 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour I Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No loss in Psi No loss in Psi No loss in Psi No loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Replaced old Weaver test boot on Regular 87 Secondary Pipe at STP Piping Sump#1,prior to testing. <br /> �) 3— N V <br /> � �eav Ci D— <br /> o <br /> 2 up <br /> EVVIRCAMENTAL HEA'TCI ! 1 <br /> DEPARTMENT- <br />