Laserfiche WebLink
OPW Installation , Operation , and Maintenance Manual , Page 76 Executive Order VR - 102 -Q <br /> STEP 7 : DRILL HOLES ously apply sealant to the first 6 male threads on the <br /> With the inlet tube in place , carefully drill ( 3 ) 1 /8 diam - valve body as shown in figure 10 . Make sure coverage <br /> eter pilot holes through the drop tube and inlet tube at is completely around the threads , and work the sealant <br /> three locations at 120 degree intervals around the tube , down into the thread profile . Quickly thread the lower <br /> 1 inch below the flange . Using the pilot holes , drill ( 3) tube onto the valve body . Tighten the tube securely by <br /> 5/ 16 " dia * holes through the tubes . Remove the burrs hand or with a strap wrench . Remove excess sealant <br /> from the drilling operation from the inside of the drop and smooth sealant bead with water moistened mixing <br /> c <br /> tube assembly with a fine half round file . ' <br /> IMPORTANT : Allow sealant ( epoxy) to cure for 24 <br /> IMPORTANT : A 5/ 16 " drill bit must be used . Do not hours before installing into tank. I <br /> substitute any other size drill bit . — <br /> _ �FC 'l5ealam „ Gwtes � i ( <br /> around lrs± 6 vue. ds �� <br /> f <br /> I (' <br /> a - - Figure 90 L it <br /> t` NOTE : Before installing the valve in the tank , a pres - <br /> Ikl, _i sure test can be performed on the valve to check for <br /> vapor tightness . Seal off both ends of the tube with <br /> Figure 7 inflatable plumber' s plugs . Apply a maximum 10" W . C . <br /> ( 1 /3 PSI ) air pressure . If pressure does not hold and a <br /> STEP 8 : ASSEMBLE AND SEAL CLINCH STUDS leak can be located with soap solution , do not install <br /> Loosely assemble the the valve . Send the valve back to OPW for warranty <br /> three ( 3) clinch studs , lock evaluation . Caution : Do not over- pressure . Excess pres- <br /> washers , and nuts in , '" sure can damage the valve . " <br /> holes . Do not tighten at Apply Sealant STEP 11 : CUT LOWER TUBE AT 46 ANGLE fJ <br /> this time . Mix up a small ' ' <br /> amount of sealant , Gen / ' <br /> ' % Measuring from the underside of the inlet tube flange , <br /> erously apply sealant un- 4, r v mark the overall length of the drop tube a distance of <br /> derneath each clinch stud . I ' �I"s ( B ) minus 6" or as per local codes or requirements . De - <br /> termine dimension B from the measurements taken in <br /> head , each nut , and on " / t rI ( ) <br /> the outside of the tube � � � ,r <br /> Step 1 , Figure 1 ( Top of the Face Seal Adaptor below the i <br /> around the holes . JY drain valve outlet in the spill container to the bot - tom <br /> of the tank ) . Saw off the excess tube at a 45- degree <br /> angle , and file off any sharp burrs ( Refer to Figure 16 ) . I <br /> Optional : Install the OPW Tank Bottom Protector on the <br /> Figure 8 lower tube ( Refer to Installation instructions supplied <br /> with the Tank Bottom Protector) . <br /> STEP 9 : TIGHTEN SELF-CLINCHING STUDS STEP 12 : PREPARE FILL RISER FOR VALVE INSER- il <br /> i <br /> Tighten clinch studs securely with a '/z' wrench . Use TION <br /> only the self-clinching studs that are supplied with the IMPORTANT : Inspect the riser pipe for any foreign ma- <br /> unit . Seating torque is 11 . 5 ft- lbs min , to 13 . 5 ft-lbs terial . Over spray from tank relining or any internal <br /> max . Do not over tighten . Note : Failure to properly burrs inside of pipe must be removed prior to installa- <br /> apply and cure the sealant may result in a failure of a tion . Failure to have an unobstructed riser pipe may <br /> pressure decay leak test. prevent proper installation or operation of the valve . c' <br /> STEP 10 : LOWER TUBE ASSEMBLY Thoroughly clean top of riser pipe . <br /> If a vise is used , clamp on the valve body casting only to I <br /> avoid damage to the float . Mix the remaining sealant ) <br /> until the color is uniform . Using the mixing stick , gener- i <br />