Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 7/9/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following <br /> equipment, if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices <br /> monitoring tank annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent <br /> piping; 7) devices monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser <br /> containment; 10 line leak detectors; and 11 devices monitoring any other secondary containment areas. <br /> W. Yosemite <br /> L4 L2 <br /> Q DT HAVE STAGE 1 OPW <br /> (� FLAPPERS SYSTEM <br /> V/R ISD ON <br /> d <br /> w <br /> LSITE <br /> 6 P <br /> v A <br /> a <br /> STP <br /> B L1 <br /> ESO <br /> VENT <br /> NEED LIFT 0 <br /> �R 7=Eleven # 17647 N <br /> FOR VENTS co 1048 W. Yosemite <br /> W4 E <br /> CAS Manteca , CA <br />