My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2231-2238 – Tiered Permitting Program
>
PR0507087
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 12:28:29 PM
Creation date
10/17/2019 11:44:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0507087
PE
2231
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
02
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r, <br /> WW <br /> WASTE MANAGEMENT <br /> Friday November 14, 2003 <br /> Mr. Gary Freudenberger <br /> Sumiden Wire Products Corp. <br /> 1412 El Pinal Drive <br /> Stockton, CA 95205 <br /> (209) 466-8924 <br /> garyf@sumidenwire.com <br /> Via e-mail: (Revised 11/18/03) <br /> Subject: Transportation, disposal and service proposal for closure of clarifier, filter press, <br /> two tanks, and associated piping/conduit. <br /> Dear Gary: <br /> Waste Management is pleased to provide disposal prices for the aforementioned project at our <br /> Kettleman Hills Facility. <br /> Labor and Service Rates <br /> Project Manager 16 hours @ $75.00/hr. $1,200.00 <br /> (2) Laborers 16 hours @ $40.00/hr. $1,280.00 <br /> PPE Flat Rate $600.00 <br /> Health& Safety Plan Flat Rate $300.00 <br /> Hand Tools/Equipment Flat Rate $500.00 <br /> Mobilization Flat Rate $1,400.00 <br /> Per Diem 5 personnel @ 2 days $800.00 <br /> Sub-total $6,080.00 <br /> Transportation Rates <br /> Roll-Off Truck 16 hours @ $70.00/hr. $1,120.00 <br /> Low Bed 16 hours @ $70.00/hr. $1,120.00 <br /> Hydro-crane 4 hours @$145.00/hr. (onsite) $580.00 <br /> Hydro-crane 16 hours @ $70.00/hr. $1,120.00 <br /> Sub-total $3,940.00 <br /> IkTrkkMEIJ7 CLI ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.