My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2231-2238 – Tiered Permitting Program
>
PR0507087
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 12:28:29 PM
Creation date
10/17/2019 11:44:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0507087
PE
2231
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
02
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Blow Down Cycle is complete . When the pressure becomes <br /> "ZERO" , shut off the air supply valve . <br /> 11 . Open the Filter Press by turning the control switches on the <br /> Filter Press Console to "HYDRAULICS OFF" , "PRESS OPEN" , "AIR <br /> OFF" . At this time , slide back the filters, one by one , and <br /> remove the "CAKE" , using the furnished poly scrapers . Care must <br /> be taken so you do not damage the fabric filters . <br /> ' 12 . When all of the "CAKE" has been removed, close the filter <br /> press by turning the control switches to "AIR ON" , "PRESS CLOSE" , <br /> "HYDRAULICS ON" . <br /> 13. With the Filter Press "CLOSED" , repeat items 9 through 12 <br /> until the Zinc Phosphate Tank is empty . On the last load, the <br /> I operator should flush out the sludge line and pump using clean <br /> water, furnished at the Sludge Pump . Close the valve going into <br /> the Sludge Pump from the Zinc Phosphate Tank and open the fresh <br /> I water valve and allow the Sludge Pump to operate for a period of <br /> approximately 2 minutes . <br /> 14 . After the tank, is empty of sludge , the operator should lower <br /> I the special barrel that was made specially for the Zinc Phosphate <br /> Scale , into the tank using the overhead hoist . Using a soft <br /> hammer, knock any remaining scale loose from the plate heat <br /> I exchangers and scoop up with a shovel and deposit the scale into <br /> the special barrel . When all of the scale is picked up, remove <br /> the barrel from the tank and deposit the contents into the "ROLL <br /> IOFF BIN" that is assigned to go to the recyclers . <br /> I <br /> I <br /> I <br /> I <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.