Laserfiche WebLink
corpora loon } <br /> 757 Arnold Drive, Suite D <br /> Martinez, CA 94553-6526 <br /> ® Tel. 925.370.3990 <br /> Fax.925.370.3991 <br /> the <br /> A Member of The IT Group <br /> VF*OUP. - <br /> ENVIRONMENTAL HEALTH DIVISION <br /> March 25, 1999 304 E. Weber Ave.Third Floor <br /> P. O. Box 388, Stockton CA 95201-0388 <br /> Mr, Harlin Knoll Approved <br /> San Joaquin County Public Health Services Denied <br /> Environmental Health Division Conditions <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 Date by <br /> RE: WORK PLAN FOR SUBSURFACE INVESTIGATION II <br /> SOUTHLAND STORE NO. 17647 +� y <br /> 1048 WEST YOSEMITE AVENUE, MANTECA., CALIFORNIA 1 <br /> Dear Mr. Knoll: <br /> i It <br /> IT Corporation proposes the following work plan to investigate soil and groundwater conditions at Southland <br /> Store No. 17647(Figure 1), as requested by the San Joaquin County Environmental Health Division (SJCEHD) <br /> via verbal communication on March 18, 1999. The scope of work includes 1) generating a site safety plan 2) <br /> drilling five soil borings using a geoprobe, and 3) reporting our findings. The scope of work is designed to <br /> i address site conditions since the removal of two 10,000-gallon underground storage tanks (USTs) and one <br /> 6,000-gallon UST in December of 1998, and to ascertain whether site closure is warranted or further remedial <br /> 1 steps are necessary. The proposed drilling locations are shown on Figure 2. Analytical results for soil samples <br /> a <br /> collected during the UST removal are summarized in Table 1 !I <br /> I SITE HEALTH AND SAFETY PLAN/PERMITTING <br /> The Health and Safety plan has been prepared by IT Corporation as required by the Occupational Safety and <br /> Health Administration (OSHA)Standard"Hazardous Waste Operations and Emergency Response"guidelines <br /> +� li <br /> (29 CFR 1910.120). The plan will be reviewed and signed by all IT Corporation personnel/subcontractors <br /> performing work on the site. Prior to the start of work, permits for the soil borings will be obtained from the <br /> SJCEHD, and Underground Service Alert (USA)will be contacted to get on-site underground utilities marked. <br /> i The SJCEHD will be notified two days prior to the.start of work, <br /> w <br /> i <br /> a <br /> I <br /> I i <br /> I � <br /> �l <br /> I � <br />