Laserfiche WebLink
Work Plan for Additional Site Assessment 4 <br /> The Southland Corporation,Store#17647, 1048 W.Yosemite Ave. Manteca CA <br /> -- October 26, 7999 <br /> Following installation, each monitoring well will be developed by using a surge block and hand bailing <br /> to remove fine-grained sediments from the well and filter pack' Water from the development process <br /> will be containerized and temporarily stored on site in DOT-approved 55-gallon drums. <br /> The top of casing of each well will be professionally surveyed relative to a mean sea level datum. At <br /> t <br /> least 48 hours after development, liquid levels in all monitoring wells will be monitored to measure <br /> I static liquid levels. The survey data will be used along with the depth-to-water measurements to <br /> calculate water elevation in the monitoring'wells, and estimate!local groundwater flow direction and <br /> l gradient. <br /> Following monitoring, four well casing volumes of water will be,'removed from each well prior to <br /> sampling of groundwater. A log will be maintained that includes measurements of pH, temperature, <br /> and conductivity of purged water. Once measurements have stabilized, groundwater samples will be <br /> collected from each well. Collected groundwater samples will be analyzed by a State-certified <br /> analytical laboratory for BTEX, MTBE, and TPH-G by EPA methods 8020/8015 modified and for <br /> MTBE and other oxygenates by EPA Method 8260. <br /> TASK 4: REPORT PREPARATION <br /> IT Corporation will prepare a report summarizing the data collected under the scope of work detailed <br /> above. The report will document the methods and results of the work, summarize laboratory analytical <br /> results, and include appropriate maps. <br /> i <br /> I <br /> I <br /> 1764?wkp.LTa <br />