Laserfiche WebLink
i ` <br /> F <br /> ME 7-Eleven Stare#17647 JOB NUMBER 77EL 17647 03 0703 <br /> DRESS 1048 West Yosemite START DATE <br /> Manteca, CA DATE PREPARED 04 08103ED FOR Tom Miller PREPARED BY Danielle Catlin-Wrr ht <br /> 70108-.KSES�U�ST FORM <br /> COP 4 WOE _',_?n il wQUgRT R 2003 _ 4N T� d gND SAMPLE 3 W LLS F <br /> 1 Arrive at site- ReviewjFlHASH, 2 work order,then call Brian Carey in Sacramento <br /> Site is an active, gasoline dispensing service station <br /> Check in with site manager Business Phone 209 239-2329, Franchisee Afsa&Antwan Safar <br /> 2 Oen wells shown on attached table and let groundwater levels equilibrate DTW should be approximately 14 to 16 <br /> +or_ <br /> 3 Monitor DTW, DTB, PT, and DO in the well shown on attached table(Top of Casing) <br /> Note calibration readin s for D O meter and take D O readings in bucket with agitated water <br /> Note if well has measurable thickness of product, visually inspect with baler <br /> 4 Using a Grundfos 2ump system, purge three casing volumes of water per well <br /> Measure& record pH, conductivity, and temperature of the purged water from the well <br /> 5 Collect 0-ml reserved VOAs from the well BTEX, TPH , &7 Oxygenates 82608 <br /> fi Place all Purcie water in a 55-gallon drum and store onsite Be sure to properly label drum <br /> Note contents of drum on field notes Note location of drum on attached site ma <br /> 7 Fill out COC and request EPA 8260E on"Standard Turnaround" <br /> 8 Deliver all samples to Kiff Analytical 2795 2nd Street,Suite 300, Davis, CA 95616 <br /> 530 297-4800 <br /> 9 Call Jaff Auchterlonie in Sacramento before you leave the site 916 861-0400 ext 223 or cell 916825-4607 <br /> 10 Fill Out Equipment Billin Sheet for aff equipment used on the job and attach with field notes <br /> 11 Give copies of all notes and COC's to Brian Carey,ASAP <br /> 12 Bill Travel time to 77EL 17647 03 0711 <br /> Bill labor time to 77EL 17647 03 0703 not to exceed 3 hours onsite labor <br /> EQUIPMENT NE DED. r v <br /> Health & Safety Site Plan <br /> -40 ml reserved HCI VOAs (bnnq extra containers and cooler with ice <br /> Grunfos Pump system, H/Tem /Cond Meter, DO Meter, Disposable Bailers, COC's, drum labels, etc <br /> 1/2", 9/16', and 15/16"sockets, and other misc tools <br /> ONE 66-gallon drum <br /> GENERAL IN bRMATION _ <br /> Direct all questions to Jaff Auchterfonie, 916 861-0400 ext 223-office <br /> PROJECT MANAGER, Jaff Auchterfonie AUTHORIZATION <br />