Laserfiche WebLink
• Third Quarter 2001 Monitoring and Sampling Report and Pre-Closure Sampt�ng Workplan 4 <br /> 7-Eleven Inc Store#17647,1048 West Yosemite Avenue Manteca,CA October 4 2001 <br /> rResults will be submitted with calculations of residual MTBE and TPH-G mass In soil and groundwater <br /> based on the latest data The report of findings will be combined with fourth quarter 2001 results, pending <br /> approval of this scope of work in sufficient time to schedule field operations prior to the end of the fourth <br /> quarter 2001 Otherwise,the work will be conducted within 6-8 weeks of SJCEHD approval The report <br /> will be reviewed and signed by a California State Registered Geologist <br /> 1 If you have any questions or comments concerning this report, please call our Concord office at <br /> (925)288-9898 <br /> Sincerely, <br /> IT Corporation IT Corporation r�1zTD COOL <br /> Submitted by Approved by c ��' kF D) oG, <br /> o <br /> Shelby Lathrop Ed K Simonis, R G z <br /> Protect Manager Senior Geologist * "} NO 4422 <br /> c Mr Harlin Knoll -San Joaquin County Environmental Health Department ✓~� ��F cfll Tfd <br /> Attachments <br /> 1 Figures <br /> 2 Tables <br /> 3 Field Data Sheets <br /> 4 Laboratory Analytical Report for Groundwater Samples <br /> i <br /> 1 <br /> 217S6g4 rpt <br /> 1 <br />