Laserfiche WebLink
0 <br />Lu <br />Lu <br />U) <br />Lu <br />ry <br />U) <br />0 <br />ry <br />C6 <br />Lu <br />U <br />ry <br />Lu <br />U) <br />0 <br />Z <br />Q <br />Z <br />Lu <br />Lu <br />Z <br />Z <br />Lu <br />GENERAL NOTES <br />HVAC GENERAL NOTES CON'T. <br />LEGENDS, SYMBOLS AND ABBREVIATIONS <br />LEGENDS, SYMBOLS AND ABBREVIATIONS CON'T <br />1. CONTRACTOR SHALL VISIT JOB SITE, VERIFY FIELD CONDITIONS, REVIEW <br />17. PROVIDE TO THE OWNER TWO SETS OF AS -BUILT DRAWINGS AND TWO <br />PLAN AND SPECIFICATIONS AND SHALL INCLUDE IN HIS PRICE THE <br />BOUND SETS OF ALL OPERATING MANUALS, DIAGRAMS SERVICE CONTRACTS, <br />SYMBOL DESCRIPTION <br />SYMBOL ABBREV. DESCRIPTION <br />NECESSARY COST TO CONSTRUCT THIS PROJECT IN ACCORDANCE WITH THE <br />GUARANTEES, ETC. <br />TAGOT # -- DIGITAL PROGRAMMABLE THERMOSTAT <br />MECHANICAL DRAWING AND SHALL MEET ALL APPLICABLE CODES. <br />18. TEST AND BALANCE ALL EQUIPMENT AND DEVICES TO PERFORM AND <br />UP EQUIPMENT TYPE <br />CSD CEILING SUPPLY DIFFUSER W/ MANUAL <br />®VOLUME <br />LO EQUIPMENT NUMBER <br />2. ALL MATERIAL AND EQUIPMENT FURNISHED AND INSTALLED SHALL BE NEW, <br />DELIVER SPECIFIED QUANTITIES ON THE DRAWING. AIR BALANCING SHALL BE <br />DAMPER <br />FREE FROM DEFECTS AND SHALL BE GUARANTEED FOR A PERIOD OF ONE <br />PERFORMED BY 3RD PARTY. SUBMIT 4 SET OF AIR BALANCE REPORT TO <br />DETAIL DRAWING NUMBER <br />❑HrP <br />CRR CEILING RETURN REGISTER W MANUAL <br />YEAR FROM DATE OF FINAL ACCEPTANCE BY THE OWNER. SHOULD ANY <br />THE ENGINEER PRIOR FINAL. <br />M-� DETAIL DRAWING PAGE <br />",, rXfPP ■1-7 <br />JJ J'J`J�JJJ <br />TROUBLE DEVELOP DURING THE PERIOD DUE TO FAULTY WORKMANSHIP OR <br />VOLUME DAMPER <br />aJJJ Dems <br />MATERIAL, THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIAL <br />19. THE MATERIAL OF THE DUCTS SHALL BE AS FOLLOWING; a) EXPOSED <br />UP DN <br />CRR CEILING EXHAUST GRILLE W/ MANUAL <br />SJe�r�V1C�e�Sj IrYL►C�. <br />AND LABOR TO CORRECT THE TROUBLE WITHOUT COST TO THE OWNER. <br />DUCTS GALVANIZED SHEET METAL WITH GAUGE PER LATEST SMACNA <br />® SUPPLY1z <br />VOLUME DAMPER <br />JJJ.�J <br />STANDARD. b DUCTS CONCEALED IN CEILING SPACE : GALVANIZED SHEET <br />) <br />RECTANGULAR DUCT SECTION/UP <br />( OR PENETRATION THROUGH <br />MVD/OBD MANUAL VOLUME / OPPOSED -BLADE <br />ADR: 3119 Central Parkway, <br />Dublin 4568 <br />3. CONTRACTOR IS TO REVIEW THE PLANS OF OTHER DISCIPLINES AND <br />METAL WITH GAUGE PER LATEST SMACNA STANDARD OR <br />® � EXHAUST <br />8- 29 <br />TEL: 510-788-6029 <br />COORDINATE WITH THE WORK OF OTHER TRADES PRIOR TO INSTALLATION <br />FACTORY -FABRICATED DUCT LISTED AND LABELED UMC 10-1 OR UL181 <br />FLOOR/ROOF). <br />BALANCING DAMPER <br />CEL: 510-468-0613 <br />FAX: 510-788-6039 <br />TO AVOID ANY CONFLICT BETWEEN DUCTS, CONDUITS, SPRINKLERS, PIPING, <br />TESTED TO CAPABLE OF HANDLING 4" W.C. STATIC PRESSURE. C) <br />® 0 RETURN <br />UP DUCT UP WITH SMOOTH 900 ELBOW <br />LIGHTING FIXTURES, ETC. NO EXTRAS WILL BE ALLOWED FOR CORRECTION <br />BATHROOM & KITCHEN EXHAUST DUCTS AND DRYER VENTS : GALVANIZED <br />DUCT DOWN WITH SMOOTH <br />OF CONFLICTS DUE TO LACK OF COORDINATION. <br />SHEET METAL INSTALL IN ACCORDANCE WITH METHODS AND STANDARDS OF <br />DN <br />QROFESS/p� <br />o Nu i <br />ASHRAE AND SMACNA FOR LOW PRESSURE CONSTRUCTION. <br />20X00 B <br />90G ELBOW <br />���P <br />9� <br />4. THE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO <br />(X� CEILING EXHAUST REGISTER <br />AP ACCESS PANEL <br />z <br />W m <br />DETERMINE EXACT LOCATION OF PIPING, DUCT WORK OR DIFFUSERS. <br />20. FACTORY -FABRICATED DUCT SYSTEMS. <br />J <br />M353 4 <br />- 2 0 0 <br />B <br />6/30/19 <br />A. ALL FACTORY -FABRICATED DUCT SYSTEMS SHALL COMPLY WITH UL 181 <br />20x10 <br />�A POC POINT OF CONNECTION <br />s <br />5. THE CONTRACTOR SHALL BRING TO THE ARCHITECT'S ATTENTION OF ANY <br />FOR DUCTS AND CLOSURE SYSTEMS, INCLUDING COLLARS, CONNECTIONS <br />o <br />DISCREPANCY OR CONFLICTS IN THE PLANS OR THE SITE CONDITIONS. ALL <br />AND SPLICES, AND BE LABELED AS COMPLYING WITH UL 181. UL 181 <br />(� CEILING RETURN REGISTER <br />�� POD POINT OF DISCONNECT <br />NECESSARY CHANGES MUST BE APPROVED IN WRITING BY THE ARCHITECT <br />TESTING MAY BE PERFORMED BY UL LABORATORIES OR A LABORATORY <br />CEILING SUPPLY TOP FIGURE INDICATES CFM. <br />FSD FIRE AND SMOKE DAMPER COMBO <br />BEFORE START OR WORK. <br />APPROVED BY THE EXECUTIVE DIRECTOR. <br />200 A BOTTOM FIGURES INDICATES <br />� <br />B. ALL PRESSURE -SENSITIVE TAPES, HEAT -ACTIVATED TAPES, AND MASTICS <br />2 0x10x3 DIFFUSER WITH NECK SIZE DIRECTION AND <br />FLEXIBLE DUCT <br />DSD DSD DUCT -MOUNTED SMOKE DETECTOR <br />Revisions <br />Date <br />6. CONTRACTOR TO SUBMIT CATALOG CUT SHEETS OF ALL THE MATERIAL <br />USED IN THE MANUFACTURE OF RIGID FIBERGLASS DUCTS SHALL COMPLY <br />(Xl NUMBER OF THROWS ON <br />AND AIRFLOW <br />AND EQUIPMENT TO BE USED AND WORKING SHOP DRAWINGS FOR <br />WITH UL 181 AND UL 181 A. <br />-200 SUPPLY DIFFUSER. DUCT SIZE <br />B PATTERN <br />PROGRESS REVIEW <br />10-01-2018 <br />PERMIT SET <br />10-29-2018 <br />APPROVAL BEFORE START OF WORK. <br />C. ALL PRESSURE -SENSITIVE TAPES AND MASTICS USED WITH FLEXIBLE <br />20x10 IS FULL SIZE OF DIFFUSER/ <br />LINE TYPE ABBREV. DESCRIPTION <br />DUCTS SHALL COMPLY WITH UL 181 AND UL 181 B. <br />SIDEWALL EXHAUST REGISTER CONNECTION. LETTER <br />OR RETURN <br />E 12x8 EXISTING DUCT TO REMAIN WITH EXISTING <br />7. SUPPORTS FOR ALL PIPING AND DUCTWORK SHALL BE IN ACCORDANCE <br />"GUIDELINES <br />D. JOINTS AND SEAMS OF DUCT SYSTEMS AND THEIR COMPONENTS SHALL <br />INSIDE CIRCLE INDICATES <br />REGISTER <br />(E) DIMENSIONS SHOWN <br />WITH LATEST SMACNA FOR SEISMIC RESTRAINTS OR <br />NOT BE SEALED WITH CLOTH -BACK RUBBER ADHESIVE DUCT TAPES <br />DIFFUSER TYPE. SEE DIFFUSER <br />E 12x8 <br />MECHANICAL SYSTEMS AND PLUMBING SYSTEMS". <br />UNLESS SUCH TAPE IS USED IN COMBINATION WITH MASTIC AND <br />SCHEDULE FOR DIFFUSER <br />DRAWBANDS. <br />21. DUCTWORK SHALL BE SUPPORTED PER SMACNA STANDARDS. <br />TYPES. <br />11 48 50Lx1 x2" B <br />II LINEAR SLOT TOP FIGURE INDICATES CFM. BOTTOM <br />FIGURE INDICATES LENGTH OF <br />12x8 (N) EXISTING DUCT TO REMAIN WITH EXISTING <br />DIMENSIONS SHOWN <br />12x8 <br />HVAC GENERAL NOTES <br />Preliminary set <br />Design Review Set <br />1. ALL WORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND <br />I DIFFUSER SLOT/NUMBER OF SLOTS/SLOT WIDTH <br />Plan Check Set <br />x <br />DRAWING INDEX <br />FEDERAL CODES, LAWS AND REGULATIONS.11 <br />22. SEAL ALL TRANSVERSE JOINTS OF AIR DUCTS WITH DUCT SEALANT PER <br />Plan Check Resubmit <br />Construction Set <br />2. ALL NEW DUCT SHALL BE SUPPORTED PER THE MINIMUM REQUIREMENT OF <br />SMACNA STANDARD. <br />12x8 RECTANGULAR DUCT WITH NET INSIDE DIMENSIONS <br />LATEST SMACMA GUIDELINE, AND SHALL BE BRACED AND GUYED TO <br />SHOWN IN INCHES. <br />ME -0.1 MECHANICAL NOTES AND GENERAL INFORMATION <br />PREVENT LATERAL OR HORIZONTAL SWING; THE USE OF SEISMIC RESTRAIN <br />23. SUPPLY AND RETURN AIR DUCTS AND PLENUMS OF A HEATING OR COOLING <br />------ DUCT WITH INTERNAL ACOUSTICAL INSULATION. <br />12x8-- <br />ME -0.2 MECHANICAL SCHEDULES <br />ME -0.3 MECHANICAL DETAILS <br />GUIDELINES PER SMACNA IS ALSO APPLICABLE 604.2 and 604.5. FASTEN <br />( ) <br />SYSTEM SHALL BE INSULATED TO ACHIEVE THE MINIMUM THERMAL (R) <br />-- DIMENSIONS SHOWN ARE NET INSIDE IN INCHES. <br />ME -0.4 MECHANICAL PRESCRIPTIVE TITLE 24 COMPLIANCE <br />ALL DUCT WORK JOINTS AND SEAMS WITH SHEET METAL SCREW AND <br />VALUE AS SET FORTH IN 2016 CMC TABLE E 503.7.2(2) AND 503.7.3(1). <br />ME -0.5 MECHANICAL PRESCRIPTIVE TITLE 24 COMPLIANCE <br />CAULK AIR TIGHT TO AVOID AIR STREAK. <br />APPROVED MATERIALS SHALL BE INSTALLED ON DUCTS AND PLENUMS FOR <br />12"0 ROUND DUCT WITH NET INSIDE DIMENSION <br />ME -0.6 MECHANICAL PRESCRIPTIVE TITLE 24 COMPLIANCE <br />INSULATING, SOUND DEADENING, OR OTHER PURPOSES. MATERIALS SHALL <br />SHOWN <br />ME -0.7 MECHANICAL PRESCRIPTIVE TITLE 24 COMPLIANCE <br />3. CONTRACTOR IS DIRECTED TO VISIT SITE AND BE FULLY COGNIZANT OF <br />HAVE A MOLD, HUMIDITY, AND EROSION -RESISTANT SURFACE THAT MEETS <br />12"0 SS 316L WELDED STAINLESS STEEL DUCT <br />ALL CONDITIONS PRIOR TO PROPOSAL. VERIFY EXACT LOCATION, <br />THE REQUIREMENTS OF THE REFERENCED STANDARD FOR AIR DUCTS IN <br />ME -1.0 GROUND FLOOR REFLECT CEILING PLAN <br />ELEVATIONS, SIZES AND CONDITIONS OF EXISTING UTILITIES, DUCTS AND <br />CHAPTER 17. INSULATION APPLIED TO THE SURFACE OF DUCTS, INCLUDING <br />SQUARE ELBOW W/ TURNING VANES IN SUPPLY DUCT <br />ME -2.0 ROOF MECHANICAL PLAN <br />PIPING ASSOCIATED WITH THE PROJECT ANY EXTRA EXPENSE DUE TO <br />DUCT COVERINGS, LININGS, TAPES, AND ADHESIVES, LOCATED IN BUILDINGS <br />ONLY <br />FAILURE TO MAKE SUCH EXAMINATION. SHALL NOT BE MADE. WHERE <br />SHALL HAVE A FLAME -SPREAD INDEX NOT GREATER THAN TWENTY-FIVE <br />ME -3.0 KITCHEN HOOD DETAILS <br />CHANGES IN THE EXISTING WORK ARE NECESSARY TO PERMIT THE <br />INSTALLATION OF NEW WORK, THEY SHALL BE MADE AT NO ADDITIONAL <br />(25) AND A SMOKE DEVELOPED INDEX NOT GREATER THAN FIFTY (50), <br />% <br />ME -3.1 KITCHEN HOOD EXHAUST FAN DETAIL AND WIRING DIAGRAM <br />Z <br />WHEN TESTED AS A COMPOSITE INSTALLATION. <br />/ R/D =1.5, 90° / 45° RADIUS <br />COST TO THE OWNER. <br />ELBOW <br />SCOPE OF WORK <br />O <br />4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED UTILITY <br />24. RECTANGULAR DUCT AND PLENUMS SHALL BE FABRICATED OF GALVANIZED <br />STEEL. INSULATE PLENUMS AND RECTANGULAR DUCTING AS INDICATED. <br />ROUND DUCT TAP ON RECTANGULAR DUCT <br />FURNISH AND INSTALL HVAC SYSTEM FOR TENANT SPACE WITH ALL <br />SERVICES, INSPECTIONS AND PERMITS. <br />12x8 <br />0 <br />DUCT SHALL HAVE THE MINIMUM GAUGE PER SMACNA. FOR PRODUCT <br />TAP ENTRY AREA EQUALS 150% OF BRANCH AREA <br />OTHER REQUIRED COMPONENTS FOR PROPER SYSTEM FUNCTIONALITY. <br />5. ALL MECHANICAL WORK SHALL BE CONCEALED, UNLESS OTHERWISE NOTED. <br />CONVEY DUCT, MINIMUM GAUGE OF SHEET METAL SHALL MEET <br />�e <br />REQUIREMENTS LISTED ON 2016 CMC TABLE 506.2(1) AND TABLE 506.2(2).12x8 <br />RECT. DUCT TAP ON RECTANGULAR DUCT <br />FURNISH AND INSTALL KITCHEN HOOD MAKE-UP AIR AND EXHAUST <br />TAP ENTRY AREA EQUALS 150% OF BRANCH AREA <br />SYSTEM WITH ALL OTHER REQUIRED COMPONENTS FOR PROPER SYSTEM <br />6. CLEAN THE PREMISES ON A DAILY BASIS TO LEAVE WORK AREA IN AN <br />FUNCTIONALITY. <br />UNCLUTTERED CONDITION. <br />25. CONTRACTOR SHALL COORDINATE WITH ARCHITECT BEFORE PURCHASING <br />O <br />DIFFUSERS AND REGISTERS FOR APPROPRIATE SIZE, TYPE, FINISH, AND <br />ROUND DUCT WITH 45° <br />0 PROVIDE MATERIAL AND LABOR FOR HAVC SYSTEM BALANCING, TESTING, <br />7. INSTALL THE ENTIRE MECHANICAL SYSTEM TO ELIMINATE ANY <br />INSTALLATION LOCATION. <br />TAKE -OFF <br />AND SCHEDULING. <br />OBJECTIONABLE VIBRATION AND NOISE. <br />26. VERIFY THERMOSTAT/SWITCH LOCATIONS W/ARCHITECT PRIOR TO <br />CONCENTRIC / ECCENTRIC DUCT REDUCER <br />0 FURNISH AND INSTALL RESTROOM VENTILATION SYSTEM WITH ALL OTHER <br />8. NOTIFY OWNER'S REPRESENTATIVE IMMEDIATELY IF A DISCREPANCY <br />INSTALLATION. <br />RECTANGULAR TO RECTANGULAR, ROUND TO ROUND <br />REQUIRED COMPONENTS FOR PROPER SYSTEM FUNCTIONALITY. <br />BETWEEN THE DRAWING AND THE ACTUAL SITE CONDITION OCCURS. STOP <br />OR DUCT TO FILTER HOUSING TRANSFORMATION. <br />THE WORK THAT IS AFFECTED AND OBTAIN INSTRUCTION FROM THE <br />MAX. 150 INCLUDED ANGLE EXCEPT WHERE SHOWN <br />f <br />, <br />OWNER'S REPRESENTATIVE BEFORE THE WORK CAN BE RESTARTED. <br />27. MECHANICAL CONTRACTOR SHALL PROVIDE ALL APPURTENANCES WHICH <br />OTHERWISE. <br />SHALL INCLUDE BUT NOT LIMITED TO WIRING IN CONDUIT AS REQUIRED BY <br />CALIFORNIA GREEN BUILDING CODE NOTES <br />9. THE DRAWING INDICATES THE GENERAL ARRANGEMENT AND LOCATION OF <br />CODE, CONTROL DEVICES, DAMPER, ACTUATORS, MOTORS, LINKAGES, <br />RECTANGULAR TO ROUND DUCT TRANSFORMATION <br />>= <br />1. THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING <br />PIPING, DUCTWORK, AND EQUIPMENT. MAKE DEVIATIONS SUCH AS OFFSETS <br />CONTROLLERS, RELAYS, CONTRACTORS, REDUCED VOLTAGE TRANSFORMERS, <br />CONSTRUCTION IF NECESSARY TO CONDITION THE BUILDING OR AREAS <br />U)IN <br />DUCTS AND PIPES THAT ARE NECESSARY TO MEET SITE CONDITIONS <br />PNEUMATIC TUBES, PNEUMATIC CONTROL VALVES, ETC. AS REQUIRED TO <br />MANUAL SINGLE BLADE OR MULTIPLE BLADE <br />OF ADDITION OR ALTERATION WITHIN THE REQUIRED TEMPERATURE <br />F ---AND <br />TO COORDINATE WORK WITH OTHER TRADES. ALL DEVIATIONS TO THE <br />AUTOMATICALLY PERFORMED ALL FUNCTIONS. <br />VOLUME DAMPER <br />RANGE FOR MATERIAL AND EQUIPMENT INSTALLATION. IF THE HVAC SYSTEM <br />Wz p <br />CONTRACT DOCUMENT, WHETHER SHOWN OR NOT, SHALL BE THE <br />FSD <br />IS USED DURING CONSTRUCTION, USE RETURN AIR FILTERS WITH A <br />O~ <br />CV <br />RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE MADE AT NO EXTRA <br />28. DUCT TESTING AND SEALING SHALL BE PERFORMED BY HERS RATER AND <br />FIRE/SMOKE DAMPER W/ DUCT ACCESS <br />MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8. REPLACE ALL <br />W J LO <br />EXPENSE TO THE OWNER. <br />THE CERTIFICATE & FORMS SHALL BE SUBMITTED TO THE CITY. <br />PANEL <br />FILTERS IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF THE BUILDING IS <br />OCCUPIED DURING ALTERATION, AT THE CONCLUSION OF CONSTRUCTION. <br />2 Q <br />0 <br />10. OBTAIN AND FOLLOW MANUFACTURER'S DIRECTIONS WHEN INSTALLING NEW <br />29. PROVIDE ACCESS PANELS FOR ALL FIRE DAMPERS, FIRE/SMOKE DAMPERS <br />FLEXIBLE CONNECTION IN <br />Z U <br />EQUIPMENT. SUBMIT OPERATING AND MAINTENANCE MANUALS. <br />AND ACCESS FOR SHUT-OFF AND CONTROL VALVES. COORDINATE ALL <br />DUCT <br />2. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE <br />an 0 <br />CEILING AND WALL ACCESS WITH GENERAL CONTRACTOR. <br />CONSTRUCTION SITE UNTIL FINAL STARTUP OF THE HEATING, COOLING AND <br />Q z <br />11. COORDINATE ALL CUTTING AND PATCHING WITH GENERAL CONTRACTOR, <br />VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR DISTRIBUTION <br />O <br />INDIVIDUAL SUB -CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING <br />ABBR. DESCRIPTION ABBR. DESCRIPTION <br />COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET <br />V z <br />AND PATCHING TO THEIR WORK. <br />30. FIRE DAMPER AND FIRE/SMOKE COMBINATION DAMPERS SHALL BE LABELED <br />METAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO <br />O z W <br />BY AN APPROVED TESTING AND LISTING AGENCY. <br />AFF ABOVE FINISHED FLOOR FR FROM <br />REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS WHICH MAY ENTER <br />Q m U <br />12. COORDINATE ALL WORK WITH ARCHITECTURAL, ELECTRICAL AND <br />THE SYSTEM. <br />LzLJ r <br />STRUCTURAL, AND PLUMBING DRAWINGS, INSTALL ALL WORK TO CLEAR <br />APPLICABLE CODE <br />BLDG BUILDING GE GREASE EXHAUST <br />F___00 <br />U)NEW <br />AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. <br />BSMT BASEMENT <br />3. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED <br />ICS IN CEILING SPACE <br />AREAS OF THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND <br />13. FURNISH AND INSTALL COMPLETE ALL MATERIALS, EQUIPMENT AND LABOR <br />2016 CALIFORNIA BUILDING CODE <br />2016 CALIFORNIA MECHANICAL CODE <br />CFF CAP FOR FUTURE INS INSULATION (THERMAL) <br />RETURN AIR THAT PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING <br />AS SHOWN AND AS NECESSARY FOR COMPLETE WORKABLE SYSTEM. <br />2016 CALIFORNIA PLUMBING CODE <br />CLG CEILING <br />VALUE (MERV) OF 8. MERV8 FILTER SHALL BE INSTALLED PRIOR TO <br />Scale: AS NOTED <br />201 6 CALIFORNIA ENERGY CODE <br />CSD CEILING SUPPLY DIFFUSER NIC NOT IN CONTRACT <br />OCCUPANCY, AND RECOMMENDATION FOR MAINTENANCE WITH FILTERS OF <br />14. CONTRACTOR SHALL GUARANTEE THAT THE WORK DONE UNDER THIS <br />2016 CALIFORNIA FIRE CODE <br />THE SAME SHALL BE INCLUDED IN THE OPERATION AND MAINTENANCE <br />Drawn By: AL <br />SPECIFICATION WILL BE FREE FROM FAULTY MATERIALS OR WORKMANSHIP <br />2016 CALIFORNIA GREEN BUILDING CODE <br />EA EXHAUST AIR OSA OUTSIDE AIR (FRESH AIR) <br />MANUAL. <br />AND HEREBY AGREES, UPON RECEIVING NOTIFICATION FROM THE OWNER, <br />2016 NEPA 13 <br />AND TO ITS ENTIRE SATISFACTION, ALL DEFECTS, DAMAGES OR <br />ALL AMENDMENTS AND SUPPLEMENTS TO ABOVE CODES <br />DN DOWN SA SUPPLY AIR <br />4. PROGRAM HEATING AND COOLING SET -POINTS OF AC UNITS THAT ARE <br />Approved By: JP <br />IMPERFECTIONS APPEARING IN SAID WORK WITHIN A PERIOD OF ONE(1)ALL <br />CITY OF STOCKTON ORDINANCES AND AMENDMENTS TO ABOVE CODES <br />SAD SEE ARCHITECTURAL DRAWINGSERVING <br />A COMMON AREA IDENTICALLY TO PREVENT AC SYSTEM FROM <br />FA FRESH AIR SOV SHUT-OFF VALVE <br />SIMULTANEOUSLY HEAT AND COOL OPERATION. <br />Job: 18033 <br />YEAR FROM DATE OF FILING NOTICE OF COMPLETIONS. <br />Sheet: <br />SRR SIDEWALL RETURN REGISTER <br />FL FLOOR <br />15. ALL SUPPLY AIR DUCTWORK WITHIN UN -CONDITIONAL SPACE SHALL BE <br />FR FROM <br />MECHANICAL NOTES <br />EXTERNALLY OR INTERNALLY INSULATED WITH MINIMUM R-8 INSULATION. <br />UTR UP THROUGH ROOF <br />AND GENERAL <br />16. RESTORE ALL DAMAGE AND LEAVE PREMISES IN CLEAN CONDITION WHEN <br />VTF VENT THROUGH ROOF <br />INFORMATION <br />FINISHED WITH WORK. <br />of: ME=Oml <br />