STATE OF CALIFORNIA
<br />INDOOR LIGHTING — LIGHTING CONTROLS
<br />;EC-NRCC-LTI-02-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E
<br />Indoor Lighting - Lighting Controls (Page 1 of 3)
<br />Project Name: 85 DEGREE C - Stockton Date Prepared: 10/1/2018
<br />A. Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.)
<br />YES
<br />NO
<br />Control Requirements
<br />Signature Date:
<br />10/1/2018
<br />0
<br />Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance
<br />City/State/Zip: San Francisco, CA 94108
<br />Phone: 415-982-1828
<br />Efficiency Regulations in accordance with Section 110.9.
<br />I certify the following under penalty of perjury, under the laws of the State of California:
<br />1. The information provided on this Certificate of Compliance is true and correct.
<br />Lighting shall be controlled by a lighting control system or energy management control system in accordance with §110.9. An Installation Certificate
<br />12)
<br />0
<br />shall be submitted in accordance with Section 130.4(b).
<br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
<br />documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
<br />One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and
<br />®
<br />builder provides to the building owner at occupancy.
<br />Responsible Designer Name: Dennis Cheung Responsible Designer Signature:
<br />Company: C&N Engineers, Inc
<br />Date Signed: 10/1/2018
<br />§130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b).
<br />License: E9279
<br />City/State/Zip:
<br />San Francisco, CA 94108
<br />A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an
<br />`(D
<br />Lighting Control Schedule
<br />Installation Certificate shall be installed in accordance with Section 130.4(b).
<br />O
<br />All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's
<br />Q M
<br />o
<br />instructions in accordance with Section 130.1.
<br />O
<br />Q
<br />All luminaires shall be functionally controlled with manual ON and OFF lighting controls in accordance with Section 130.1(a).
<br />05
<br />06
<br />General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental,
<br />Q
<br />Q
<br />and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display,
<br />11
<br />12
<br />ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4.
<br />®
<br />15
<br />The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the
<br />Type/ Description of Lighting
<br />multi-level lighting control requirements in accordance with Section 130.1(b).
<br />0
<br />0
<br />All installed indoor lighting shall be equipped with controls that meet the applicable Shut -OFF control requirements in Section 130.1(c).
<br />0
<br />0
<br />Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans.
<br />O
<br />Q
<br />Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in
<br />accordance with Section 130.1(e).
<br />Control (i.e.: occupancy sensor,
<br />Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for
<br />o
<br />0
<br />normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in
<br />t4'
<br />`4'
<br />accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut -OFF
<br />N
<br />controls, and demand responsive controls.
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance
<br />STATE OF CALIFORNIA
<br />INDOOR LIGHTING — LIGHTING CONTROLS
<br />January 2016
<br />-EC
<br />-NRCC-LTI-02-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION T
<br />CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E
<br />Indoor Lighting - Lighting Controls (Page 3 of 3)
<br />Project Name: 85 DEGREE C - Stockton Date Prepared: 10/1/2018
<br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br />1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
<br />Documentation Author Name: Dennis Cheung Documentation Author Signature:
<br />Company:
<br />C&N Engineers, Inc
<br />Signature Date:
<br />10/1/2018
<br />Address: 391 Sutter Street, Suite 202
<br />CEA Certification Identification (if applicable):
<br />City/State/Zip: San Francisco, CA 94108
<br />Phone: 415-982-1828
<br />RESPONSIBLE PERSON'S DECLARATION STATEMENT
<br />I certify the following under penalty of perjury, under the laws of the State of California:
<br />1. The information provided on this Certificate of Compliance is true and correct.
<br />2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
<br />(responsible designer).
<br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
<br />Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
<br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
<br />documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
<br />5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
<br />enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the
<br />builder provides to the building owner at occupancy.
<br />Responsible Designer Name: Dennis Cheung Responsible Designer Signature:
<br />Company: C&N Engineers, Inc
<br />Date Signed: 10/1/2018
<br />Address: 391 Sutter Street, Suite 202
<br />License: E9279
<br />City/State/Zip:
<br />San Francisco, CA 94108
<br />Phone:
<br />415-982-1828
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance
<br />January 2016
<br />STATE OF CALIFORNIA
<br />INDOOR LIGHTING — LIGHTING CONTROLS
<br />SEC-NRCC-LTI-02-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION T
<br />CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E
<br />Indoor Lighting - Lighting Controls (Page 2 of 3)
<br />Project Name: 85 DEGREE C - Stockton Date Prepared: 10/1/2018
<br />A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following:
<br />❑✓ CONDITIONED SPACES ❑ UNCONDITIONED SPACES
<br />B. Mandatory and Prescriptive Indoor Lighting Control Schedule, PAF Calculation, and Field Inspection Checklist
<br />PAF Credit
<br />Calculation
<br />z
<br />n
<br />�
<br />N
<br />h D
<br />_T
<br />F
<br />iz
<br />Standards Complying With 1
<br />0
<br />n
<br />N
<br />(✓ all that apply, or leave empty?
<br />o
<br />X
<br />C: v
<br />`(D
<br />Lighting Control Schedule
<br />if Exem ted
<br />p )
<br />Q -n
<br />o
<br />—
<br />Q M
<br />o
<br />01
<br />02
<br />03
<br />04
<br />05
<br />06
<br />07
<br />08
<br />09
<br />10
<br />11
<br />12
<br />13
<br />14
<br />15
<br />Type/ Description of Lighting
<br />Control (i.e.: occupancy sensor,
<br />#
<br />c4
<br />W)
<br />N
<br />t4'
<br />`4'
<br />L01
<br />N
<br />Location in Building
<br />automatic time switch,
<br />of
<br />o
<br />0
<br />0
<br />0 0
<br />LU
<br />�ao,
<br />CD
<br />v
<br />v
<br />dimmer, automatic daylight,
<br />Units
<br />N
<br />v
<br />o
<br />0-
<br />v
<br />N
<br />CL
<br />N
<br />m
<br />N
<br />in
<br />CL
<br />_
<br />etc...)
<br />DINING/DISPLAY
<br />OS/DIMMER/DL/SWITCH
<br />10
<br />0
<br />❑
<br />0
<br />1 0
<br />KITCHEN
<br />OS/DIMMER/SWITCH
<br />3
<br />•
<br />•
<br />0
<br />❑
<br />0
<br />0
<br />TRANSACTION
<br />OS/DIMMER/SWITCH
<br />4
<br />•
<br />•
<br />0
<br />❑
<br />0
<br />0
<br />RESTROOMS
<br />OS/DIMMER/SWITCH
<br />6
<br />•
<br />•
<br />0
<br />❑
<br />0
<br />0
<br />0
<br />❑
<br />0
<br />0
<br />0
<br />❑
<br />0
<br />0
<br />0
<br />❑
<br />0
<br />0
<br />Control Credit PAGE TOTAL (Sum of Column 13):
<br />0
<br />IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column 13):
<br />Enter Control Credit total
<br />into NRCC-LTI-01-E; Page
<br />1.
<br />1. §130.1(0) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) =Auto Shut -Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) _
<br />Additional lighting controls installed to earn a PAF, • §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls.
<br />2. Check Table 140.6-A for correct Factor. PRFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is
<br />also required to be filled out signed, and submitted.
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance
<br />January 2016
<br />
|