Laserfiche WebLink
Site MAN Work Order No. 0000101738 9/6/2019 10:08:39AIv Page 1 <br /> NH3 Leak on tank 1508 <br /> Task No. Request Date 9/5/2019 <br /> Tenant Request Time 9:38:17AM <br /> Assigned By Originator MWEBB <br /> Assigned To BHORTON Telephone No. <br /> Scheduled Start Date Extension <br /> Scheduled Finish Date WO Type CM <br /> Perform by Warranty No Completion Date <br /> Priority 1.00 Completion Time <br /> Expense Class MECH Project Task <br /> Project ID <br /> Craft Estimated Crew Size Estimated Labor Hours <br /> Equipment No.MAN-TNKW-1508 <br /> Equipment Description TANK,FOR WINE <br /> Serial No. User-defined Held 1 <br /> Cost Center User-defined field 2 <br /> General Ledger No. User-defined field 3 <br /> Department User-defined field 4 <br /> Location- User-defined field 5 <br /> Sub-location 1 - User-defined field 6 <br /> Sub-location 2- User-defined field 7 <br /> Sub-location 3 - User-defined field 8 <br /> Reason for Outage User-defined field 9 <br /> Must Be Down No User-defined field 10 <br /> Estimated Down Time <br /> DownTime <br /> Safety Note <br /> Comments 9/5/19 CHRIS CANO WELDED DIMPLE LEAK ON LOWER AMMONIA COOLING JACKET FOR TANK <br /> 1508. JUAN EVACUATED OF ALL AMMONIA AND OILS FROM THE JACKET. THE JACKET WAS <br /> THEN PURGED WITH NITROGEN AND WELDED. ONCE THE REPAIR WAS MADE THE JACKET WAS <br /> THEN PRESSURE TESTED WITH NITROGEN AND PROVEN TO HAVE NO LEAKS BY JOSE <br /> MARTINEZ. tHE TANK JACKET HAS BEEN PULLED INTO A VACUUM AND IS READY FOR <br /> SERVICE. <br /> Equipment No.(Meter) ]Meter Name Meter Reading <br /> Item No Equipment No (Parts) Item Dewnption Qty Required Date Used Qiy 0" <br /> List extra parts and comments here <br /> Employee C.'nde Equipment No (Employee) Work'Date nisi Mame Last Name Regular Oveltime Hours <br /> How s <br /> CCANO MAN-TNKW-1508 9/5/2019 CHRIS CANO 1.00 <br /> JMARTINEZ MAN-TNKW-1508 9/5/2019 JOSE MARTINEZ 1.00 <br /> JRAMIREZ MAN-TNKW-1508 9/5/2019 JUAN RAMIREZ 2.00 <br />