My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Piping system layout Flexible sump penetration fitting installation(cont'd) <br /> (contd.) 9 The flexible penetration fitting has two sections,an outer ring and an inner boot. <br /> Unscrew the ring from the penetration fitting and apply a small bead of Bostik 920 <br /> to the inner surface of the ring flange. <br /> • Apply a bead of Bostik 920 around the hole on the inside surface of the sump wall. <br /> • Place the ring into the sump wall from the outside with the threads inside the sump. <br /> • Press the gasket into the groove on the inner part of the penetration fitting. <br /> • From inside the sump,screw the penetration fitting onto the threads and tighten <br /> with adjustable pliers. <br /> Cross-overs <br /> Cross-over fittings assemblies can be fabricated in the field or can be purchased from <br /> \ the factory(Factory made um over assemblies provide minimum height change for <br /> \ this type of fitting). <br /> D+G \ Make cross-overs by using 45°elbows and tees as shown in figure 6-6.In this way the <br /> t ominimum vertical clearance can be achieved between the lines.The minimum length of <br /> pipe nipple at cross-overs and very short runs(D+G)is shown in the table below.The <br /> IB table also shows the minimum distance between fittings that will result from these <br /> a nipples being used(D)and the approximate insertion depth of the nipple into both <br /> \- fittings(G).Nipple lengths can be made any length longer than this minimum.This length <br /> i is the minimum needed to allow movement of the closure fittings and inspection of the <br /> Fig.6-6.Cross-over using Dualoy Primary system during testing. <br /> 3000/LCX fitting where,DIndicates Nominal Minimum space Insertion Minimum overall <br /> distance between fittings and D+G pipe diameter between primary fittings(D) depth(G) length(D+G) <br /> equalsoveralllengthofLCXpipe (in.) (mm) (in.) (mm) (in.) (mm) in. (mm) <br /> required to affect the cross-overallowing <br /> adequate insertion depth into fitting and 2 50 7.00 178 3.00 76 10.00 254 <br /> room to move closure pieces to allow 3 80 9.00 228 5.00 127 14.00 355 <br /> inspection of the primary. 4 100 10.50 267 6.25 159 16.75 425 <br /> Shorter jump-overs are available from Ameron as pre-fabricated assemblies. <br /> Factorymade j um change in height. <br /> Center-to-center laying lengths and net center-line height changes are shown in the <br /> provide minimum change in height. <br /> table(right)(ref.fig.6.6). <br /> Nominal Laying length(A) Height(B) <br /> pipe diameter prefabricated field fabricated prefabricated field fabricated <br /> (in.) (mm) (in.) (mm) (in.) (mm) (in.) (mm) (in.) mm <br /> 2 50 7.62 195 14.00 356 5.40 135 9.90 251 <br /> 3 80 8.55 215 18.13 460 6.05 153 12.82 325 <br /> 7 Bonding primary Joint preparation <br /> systems All tapered systems must be clean,dry and warm for a proper bond. <br /> _, Clean:Pipe is shipped from the factory with end protectors.Avoid contamination from <br /> r <br /> The hardener contained in the I fingerprints,petroleum fumes,mist and condensation as these are adverse to good <br /> bonding.If a taper becomes dirty,sand it with emery cloth.Never touch the bonding <br /> adhesive kit may burn the skin. I surface with bare hands after cleaning or sanding as this will leave an oily deposit. <br /> I Avoid inhaling the vapors.Read I <br /> and observe the label I Dry:Adhesive will not bond to a wet surface.If the taper is wet or moist,dry it with a <br /> precautions. I blow dryer or heat gun.Do not overheat or burn the pipe. <br /> L___________J Warm:Below 50°F(10°C),warm the taper with a blow dryer or heat gun.For best <br /> results,adhesive should be at least 50°F when used.Do not store kits in areas above <br /> andseal areas of containment fittings NoteItis easiest to clean the rings 100°F(38°C),below 32°F(0°C),or in the direct sunlight during warm weather.In cold <br /> s <br /> prior to bonding primary fittings.It is also weather warm the resin to at least 50°F but not above 100°F to permit good mixing and <br /> recommended that these areas be easier application. <br /> reinspected prior to closure ofsecondary Mixing Ameron adhesive <br /> to insure leak-tight connections. <br /> Note 2:Prior to bonding the primary ' Combine all of both components in the mixing container in the supplied proportions. <br /> system,itis recommended that all the • Never try to split a kit. <br /> piping be"dry-fitted"and the <br /> containment closures screwed on hand 0Mix thoroughly with the mixing stick until all streaks are gone and the adhesive <br /> tight to ensure proper alignment. has a smooth,uniform color.Mixed adhesive color is dark red. <br /> • Do not allow moisture to get into the can. <br /> Note:If the material in either container cannot be mixed,the kit should not be used. O <br /> Note:Grit in adhesive may be sitting on top of resin component.It will mix in readily. <br />
The URL can be used to link to this page
Your browser does not support the video tag.