Laserfiche WebLink
Automatic line leak detectors will:be installed on pressu, �ad piping <br /> Manufacturer: Model: <br /> / Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring <br /> / system fails or is disconnected. <br /> 20. V State Water Resources Control Board"Facility(A)"and"Tank Permit(B)"application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water: <br /> (include source of information-borehole logs, monitoring well data,water <br /> studies, etc.) <br /> 23. 1 Total number of tanks on site after installation: 1 8' Lt) <br /> 24. ✓ County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility[in accordance with (CCR)Title 23, Division 3, Chapter 16,Article 11, Corrective Action Requirements] <br /> as an owner or operator to submit a workplan to EHD Site Mitigation Unit prior to initiating any assessment or <br /> remediation activities. For further assistance contact the Site Mitigation Unit at(209)469-3450. <br /> The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Name <br /> Title �u�r✓�"� Date /Z`t U� <br /> CONDITIONS OF APPROVAL: <br /> 9 <br />