My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Automatic line leak detectors will:be installed on pressu, �ad piping <br /> Manufacturer: Model: <br /> / Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring <br /> / system fails or is disconnected. <br /> 20. V State Water Resources Control Board"Facility(A)"and"Tank Permit(B)"application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water: <br /> (include source of information-borehole logs, monitoring well data,water <br /> studies, etc.) <br /> 23. 1 Total number of tanks on site after installation: 1 8' Lt) <br /> 24. ✓ County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility[in accordance with (CCR)Title 23, Division 3, Chapter 16,Article 11, Corrective Action Requirements] <br /> as an owner or operator to submit a workplan to EHD Site Mitigation Unit prior to initiating any assessment or <br /> remediation activities. For further assistance contact the Site Mitigation Unit at(209)469-3450. <br /> The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Name <br /> Title �u�r✓�"� Date /Z`t U� <br /> CONDITIONS OF APPROVAL: <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.