Laserfiche WebLink
Monitoring System Certification <br /> REGEIVEL) <br /> UST Monitoring Site Plan SEP 21 2015 <br /> Site Address: FOOD MART GAS 2185 EAST FREMONT AVE NSTOCKTON CALIFORNIA 95205 ENVIRONMENTAL <br /> Wp&vrJ nC080TRU NIT <br /> . . . . . . . . . . AIC <br /> . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . x .87. . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . <br /> 0 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 91. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> �. <br /> ` . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> DIE . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> s <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> FREMONT STREET <br /> Date map was drawn:9-22-2014 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />