My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:30:31 PM
Creation date
10/21/2019 2:23:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 SEPPf99 f <br />5. SECONDARY PIPE TESTING <br />Test Method Developed B� : X Piping Manufacturer — Industry Standard Professional E"ngfirfeelL HEAL <br />❑ Other (Spec) '."NT <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen L:quipment Resolution: 1/10-15 Psi <br />Piping Run #1 Piping Run #2 Piping Run # 3 Piping Run <br />Piping Material: Fiberglass Fiberglass Fiberglass <br />Piping Manufacturer: Ameron Ameron Ameron <br />Pining iliametar 7" 2" 2" <br />Length of Piping Run: <br />Approx. 170' <br />Approx. 160' Approx. 80' <br />Product Stored: <br />Regular 87 <br />Super 91 Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at STP Test boot at STP <br />Piping Sump #2 Piping Sump #3 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes 10 Minutes <br />Test Start Time: <br />9:30 <br />9:40 9:50 <br />Initial Reading (Rj): <br />5 Psi <br />5 Psi 5 Psi <br />Test End Time: <br />10:30 <br />10:40 10:50 <br />Final Reading (RF): <br />5 Psi <br />5 Psi -*) Psi <br />Test Duration: <br />I Hour <br />I Hour I Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi 0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi No Loss in Psi <br />Test Result: <br />Pass <br />Pass Pass <br />Comments —(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.