Laserfiche WebLink
r <br />n <br />VM1 99 M -2 -0 -00 -.New Series <br />Highest Performance, <br />Most-Reque-sted btechar-TcaE.:L rc, Ceak-DetectorrBurl#--T0day! ! <br />• Any Fuel* <br />• Any Pump* <br />• Any Pipeline System* <br />• Longest Length Pipeline System* <br />• Largest Volume Pipeline System* <br />• Integrated Check -Valve,../--, <br />Pressure relief <br />*see technical specification <br />VMJ The 99 LD -2000 <br />The 99 LD -2000 is now the most requested mechanical line leak detector built today. New <br />engineering and the VMI 2 -year warranty (after installation) make the 99 LD -2000 more <br />attractive to station operators today_than-ever before. Not only is the 99 LD -2000 less ex- <br />pensive to own, it is faster and -less subject to field and line variables than ever before! <br />Integrated In -Line Check Valve / Pressure Relief <br />Leaking check valves in the turbine, defective submersible pump pressure relief, or a defec- <br />tive bypass valve will allow the line system to depressurize, resetting the leak detector. <br />Drain -back into the pump or thermal contraction -will cause vapor pockets to form. Vapor <br />pockets -increase - the -length of time it takes for a teak detector to open to full flow. Pump <br />problems such as these result in slow flow and technical support calls. The resulting service <br />costs and customer, dissatisfaction_, -a l _take away_from_the bottom line making money. <br />9-+ G=1s=Th --GnE -Leak=-D teCtor-- - <br />Capable -Of -Holding Line Pressure After the Pump Is Off— <br />Even With _Pump -Component Wear Or Failure. <br />"Patent pending - - <br />