My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:30:31 PM
Creation date
10/21/2019 2:23:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Procedure Veeder•Root Parts <br />T Install conduit per all <br />National, State and <br />15.7" a Local codes <br />Min. (customer supplied) <br />`�—P/V assembly <br />(customer supplied) <br />T <br />I <br />2" or 3" Sched. 40 upper vent pipe, <br />Canister outlet <br />(from kit or customer supplied) <br />must be 12 feet Canister support2-pin <br />connector of cable (from <br />minimum bracket &fasteners <br />kit) attaches to CCVP valve <br />above grade from kit) <br />) <br />Cord grip (from kit) <br />Canister support <br />studs w/nuts <br />j `� Upper J -box - Install per all <br />(3 each side) <br />National, State and Local <br />fittings). All pipe and pipe fittings <br />codes (customer supplied). <br />Centerline of bracket's <br />Epoxy enclosed connections <br />lowest U -bolt --\ <br />in junction box. <br />T Install conduit per all <br />National, State and <br />15.7" a Local codes <br />Min. (customer supplied) <br />Figure 1. Typical direct wired installation example <br />18-5 <br />ARB approved IOM 18 - Carbon Canister Vapor Polisher Installation and Maintenance Guide - Executive Order VR -203 and VR -204 <br />2" or 3" Reducing tee,Sched. 40 <br />(from kit or customer supplied <br />fittings). All pipe and pipe fittings <br />must be schedule 40. All tube <br />fittings must be UL listed and <br />installed per all applicable national, <br />state and local codes and approved <br />' - - <br />by the local authority having <br />110" <br />! Minimum <br />Critical �` _ _ _ <br />dimension <br />; <br />jurisdiction. <br />2" or 3" lower vent pipe, <br />Sched. 40 (threaded to fit tee <br />if installing 332954-002 or <br />o <br />; <br />332954-003, customer supplied) <br />Vent pipe to support strut <br />' <br />; <br />fasteners <br />(customer supplied) <br />Support strut assembly <br />must be independently <br />anchored in concrete. <br />Wind loading and <br />support must comply <br />—� <br />; <br />Lower J -box - Install per all <br />National, State and Local <br />codes (customer supplied). <br />Epoxy enclosed connections <br />in junction box. <br />® <br />; <br />with local codes. <br />(customer supplied) <br />Grade <br />Figure 1. Typical direct wired installation example <br />18-5 <br />ARB approved IOM 18 - Carbon Canister Vapor Polisher Installation and Maintenance Guide - Executive Order VR -203 and VR -204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.