My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:30:31 PM
Creation date
10/21/2019 2:23:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Procedure Veeder-Root Parts <br />w <br />F___1 <br />Instructions: <br />NOTE: When temperature is below 500F (10°C), keep <br />resin in a warm place prior to mixing (e.g., in an <br />inside pocket next to body). <br />1. Open epoxy sealant package, and remove resin pak. <br />2. Holding resin pak as shown in A, bend pak along <br />long length. <br />3. As shown in B, firmly squeeze the RED SIDE of the <br />resin, forcing it through the center seal and into <br />BLACK SIDE. <br />C <br />Make sure that <br />the ends of cable <br />sheathing are <br />sub -merged in f <br />sealant ( Tie wrap <br />i <br />Wire nuts <br />4. Mix thoroughly to a uniform color by squeezing <br />contents back and forth 25-30 times. <br />5. Squeeze mixed, warm resin into one end of bag and <br />cutoff other end. <br />6. Slowly insert wiring connections into sealing pack <br />until they fit snugly against the opposite end as <br />shown in C. <br />7. Twist open end of bag and use tie wrap to close it off <br />and position the tie wrapped end up until the resin <br />jells. <br />CAUTION: Epoxy sealant is irritating to eyes, respiratory system, <br />4) and skin. Can cause allergic skin reaction. Contains: epoxy resin <br />4 , and Cycloaliphatic epoxycarboxylate. <br />Precautions: Wear suitable protective clothing, gloves, eye, and <br />face protection. Use only in well ventilated areas. Wash <br />thoroughly before eating, drinking, or smoking. I ,sc-ev'_Pv .eps <br />Figure 6. Epoxy sealing CCVP vapor valve field wiring connection=_ <br />INTRINSICALLY SAFE BAY OF TLS CONSOLE <br />SMART W 1771T2__T+3___T_+4Tr+5T+6T+7-7 <br />SENSOR • • • • • • <br />M <br />Attach Cable Shields to Ground <br />Lug Closest to Conduit Entry <br />� 0 <br />Rigid Conduit (enters Console <br />through an I.S. Bay knockout) <br />SMART SENSOR / PRESS MODULE <br />CCVP Valve <br />Figure 7 Attaching CCVP vapor valve wiring to TLS -350 Console <br />wd%MVp4ep5 <br />18-9 <br />ARB approved IOM 18 - Carbon Canister Vapor Polisher Installation and Maintenance Guide - Executive Order VR -203 and VR -204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.