Laserfiche WebLink
SWRCB,^january 2002 Page 5 of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> Test Method Developed By: 0 UDC Manufacturer 0 Industry Standardofessional Engineer <br /> Pr <br /> 0 Other(Specify) >< <br /> Test Method Used. 0 Pressure -4?, 0 Vacuum "Ydrostatic <br /> 0 Other(Specify) I <br /> Test Equipment Used:C4[dwell Jit 1. Equipment Resolution: c6ozv- <br /> s <br /> UDC I- UDC 31 UDC#5 f(e, <br /> UDC# 7f F <br /> UDC Manufacturer: <br /> UDC Material: Ab I, tvlz,S e_ ot-/ <br /> UDC Depth: f :2-7 27 2-7 <br /> Height from UDC Bottom to Top ff <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: PrY <br /> Portion of UDC Testedwq-�e,- Lc"L If" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(bothes 0 No 0 NA D No DNA r [1 <br /> s ❑NoDNA Yes D No D NA <br /> product and water)?* xy <br /> Turbine shutdown response time f0aF- No, 444-elo?eJ ,v P4- CI e-a",4 k-a4-4,-<4_-o 4 <br /> Is system programmed for fail- <br /> safe shutdown?* Yes 0 No 0 NAes El No El NA �ktes El No C1 NA ; 'es D No 0 NA <br /> Was fail-safe verified to be 0 Yes No El NA 0 Yes 6KNo DNA 0 Yes �*o DNA 0 Yes ANo 0 NA <br /> ope ational?* <br /> Wait time between applying <br /> pressure/vacuum4ate and <br /> starting test 0 T b r-1 h-,w A.e 5 <br /> Test Start Time: z 5 -7 3 0 —7-.' L4 0 <br /> Initial Reading(RI): r rst-C_n�CAP Pry,& C.rVr_(.t, P i 6 wc.Ae r-rysi- C.1vele <br /> Test End Time: 6: 55 g ,_ 06 0'. 10 8 -, 0<- <br /> Final Reading(RF): Crc_te Crvc.(� tf r,,4 C4vej e-4-c-to <br /> Test Duration: yd 36 t-1 <br /> Change in Reading(RF-R,): Nv4 <br /> V 6, <br /> Pass/Fail Threshold or Criteria: da 3d 00 st 0 5:z-7,0 <br /> Test Result: 12-11pass 0 Fail Pass 0 Fail Pass El Fail _ass 0 Fail <br /> Was sensor removed for testing? ��es El No 11 NA I es El No 11 NA �P� El No [INA <br /> [!Was sensor p d and es D No D NA <br /> Was <br /> r:s properly replaced es 0 No 0 NA �esD No 0 NA .*Yes El No El NA yes 0 No 0 NA <br /> verified functional after testing? oxy <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SVrRCB LG-160) <br />