Laserfiche WebLink
SWRCB,January 2002 Page 'I of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Teste <br /> 'Test Method Developed By: ❑Spill Bucket Manufactu cr ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Metho seed:` ❑Pressure ❑Vacuum ❑Hydros <br /> ��.. ❑Other(Spec) <br /> !� <br /> Test Equipment Used: ` �.., Equipmen solution: <br /> Spill Bob# Spill Boz# Spill Boz# Spill Boz# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change ining(RF-RI): <br /> Pass/F3ehreshold or <br /> Crit a: <br /> Test Result: ❑ Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail ❑ Pass: ❑Fail ` <br /> Com eats—(include information on repairs made prior to testing, and rpecommended ollow-u or ailed tests <br /> S i)I Over I UoYe_% Gtt4uu 0 W��d. <br />