Laserfiche WebLink
SAN JOAQW COUNTY ENVIRONMENTAL HEALTHTAIErT <br /> lieUNDERGROUND STORAGE TANK ' <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ I.NEW PLAN 5(2.CHANGE OF INFORMATION <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. �In' <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTE.ki(S): <br /> L FACILITM INFORMATION <br /> FACILITY ID 9(Agent Use Only) <br /> FACILITY NAME I l r I+Q e-ice �j N103. <br /> FACILITY SITE ADDRESS + ata. = n gigs. <br /> H. EQUIPMEINT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that resting_preventive maintenance.and calibration of monitoring equipment(e.g..sensors.probes.line leak detectors,etc.)be performed in <br /> accordance with the equipment manufacturers'instructions,or annually.whichever is more frequent Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED B] L ANNUALLY ❑ 99.OTHER(Specify): A101. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(Le..location of each sensor, <br /> line leak detector,monitoring system control panel.etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form.Hazardous Materials Business Plan map.eta)which shows all required information.include it with this plan, <br /> IN'. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) X110. <br /> 10 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR pTnUtSTIITAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: f@ a.DRY ❑ b.LIQUID FILLED [I c.UNDER PRESSURE [Id.UNDER VACUUM 5111. <br /> PANEL MANUFACTURER: \JE'C"�1_ K cr)4' att� MODEL T LJ3�� M13. <br /> LEAK SENSOR MANUFACTURER: (Yl ' \11J. MODEL 4(S): ­7g14 3120-LJQO 3115. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO: ONITOR SINGLE WALL TANK(S) <br /> PANEL-'N ANUFACTU'RER: MODEL z�: 311? <br /> IN-T-ANK PROBE MANUFACTURER: 5119. MODEL#(S): y19. <br /> LEAK TEST FREQUENCY: a.CONTINUOUS 5120- <br /> Q ❑ ❑ b.DAILY:2�IGHTLY ❑ c.WEEKLY <br /> ❑ d.MONTHLY ❑ e.OTHER(Specifr--): 31211. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ a OTHER(Specify): ]LZ S123. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.M ALNUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 V24. <br /> ❑ 4.WEEKLY'VLANUAL TANK GAUGING(MTG)PER 23 CCR§2605 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: R] a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specif,): SL'6. ac-. <br /> 6.VISUAL MONITORING DONE: ® a.DAILY ❑ b.WEEKLY rR.-gwu.-a aean-y wpn,&-� <br /> ❑ 99.OTHER(Specify): �e9. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) 5130. <br /> I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SU MP(SyTRENCH(.ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINNIENT IS: 19 a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE [Id.UNDER VACUUM 1131. <br /> PANEL MANUFACTURER: Jex` Ie-r 20L-:4- "2- MODEL i=: TLS �SSo X133. <br /> LEAK SENSOR MANUFACTURER: F-In ci .T N134. MODEL#(S): ?.135. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMAtfC PU1QP(i.e..TURBINE)SHUTDOWN? ❑ a.YES ❑ b.NO 6. <br /> WILL FAILURE DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO 513 <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOAT VITEN A LEAK IS DETEC_V'D <br /> MILD MANUFACTU:RER(s): F--� t�}l'd SOS MODEL i�(S): �U9. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: 5140. MODEL Sur <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MRQMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h_ <br /> «'ILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO 1143. <br /> RILL ELLD FAILUREDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.ITS ❑ b.NO 5144. <br /> 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ® a.ANTNUALLY ❑ b.EVERY 3 YEARS ❑ a OTHER(Specify) 3145. 1146. <br /> �] 5.VISUAL MONITORING DONE: ® a DAILY ❑ b.MEEKLY' ❑ a 69v.MONTHLY C EACH TIME SYSTEM OPERATED"" M-1-. <br /> "RcT-agent.-ap;w-al '•Allowed for mmiwei=ofunbwinl®cgenty prcn .dor fwd piing mw-per HSC§25281.4'b;g3) <br /> ® 6.PIPING 1S SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ <br /> 99.OTHER(Specify) 1149. <br /> SJCEHD-d(07/03)-114 07/23/03 <br />