My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQ ZOGNTY ENVIRONNIENTAL HEALTH DMRRTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 (One form per facility) <br /> TYPE OF ACITON ❑ 1.NEW PLAN 2-CHANGE OF INFORMATION RUT. <br /> I. FACILITY INFORMATION <br /> FACILITY ID= (Agency Use Orily) — — <br /> FACILITY NAME ll ��,, l xo�. <br /> �2 l.� 1'TL�.h er 1 c'T Ru� <br /> FACILITY SITE ADDRESS R03. I CITY Roo. <br /> :.� i�� � . -�-'��'.1 or •� �-. _ `fpr"� <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> Y If safe to do so.facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off.etc.)and,if necessary.safely remove <br /> remaining hazardous material from the GST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material.but not greater than 30 calendar days,or sooner ifrequired by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and dean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste.will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity.has been in contact kith any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e.. rainbow colors), it IS <br /> contaminated. A thick floating petroleum laver may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to stone water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any ofthe following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment: <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment: <br /> 3. Hazardous material,other than the product`waste stored in the primary containment systema is placed inside secondary containment to treat or neutralize <br /> released productivaste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILT:CONTROL AND CLEAN-UP EQUIPMETNT <br /> PERIODIC INIAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthh�.and after each use.and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> E UIP\•LENT NOT PER;LL4,NENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete only if applicable) <br /> EQUIPMENT LOCATION AN'.+II1ABILITY <br /> RI1. R21. (t31. <br /> RIZ. R22. R32. <br /> R73. R2t. R33. <br /> R14. R24. R34. <br /> R15. R29. R35. <br /> IV. RESPONISIBLE PERSONS <br /> THE FOLLOWING PERSON(S)MARE RESPONSIBLE FOR AUTHORIZING A-NY WORK NECESSARYUNDER THIS RESPONSE PLAN: <br /> NAME RJo- TITLE R50. <br /> f"GLr C r_ <br /> NAME R4 1. TITLE R31. <br /> NAhIE Ra'-- TITLE R52 <br /> NA-'*IE R33. TITLE R53. <br /> V. INDIRECT RAZARD DETERUIVIINATION <br /> This information is required only when the presence of the hazardous substance cannot be determined directly by the monitoring method used(e.g..where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAI.MN ENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R60. <br /> VCEHD-e(06/03)-113 06!25103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.