Laserfiche WebLink
r - - <br /> 1). Results of Testinx/Serviciu;�/ <br /> Softw3rc Vcrsion Installe& 3 Z l O <br /> Cr replete the following checklist: _ <br /> —_ r •c--�r.ss <br /> PO <br /> Nu* Is the au;iihic alarua up:ratit��a:a17 <br /> Nu" Is tlx:visual alarm uper tionaU _ <br /> No" Were al!scrasurs vis.t:tP,y intilctecl, fi ncLonally tcstcci,arul contirntcd opetatiunal; <br /> U o" Were all!;erasgrs installed al low•'st Point of sectjttJary co;tt-ainrncnt and po,,Wwled so that other equipment w�1 <br /> not interfere with their piohe�r operation'? <br /> n* 11 alarms are rclaye:ai m a retrw[e matritoriug sta ion, is All comnzunicatiuns cyuipment (e. . modem; <br /> /A operational? <br /> o* For prctitnrized piping; systems, does the turbine autar.Latically shut dawn 1'tlie piping seeoridary C.ortainrncw <br /> /A monitoring system dciccts a leak, !'ails to opera , or is electtically disco coed? if yes; which senscyrs initiate <br /> positive shut-down? (Clue;?k all that ahlily) iump/I ench Sensors; Dispcnsor C: ntninment Sensory, <br /> Dict you confirm positive.shut-down clod caks:deed sensor rail scunncctiorl? Yes; ❑ No. <br /> ❑ Ycs I U NO For tank systoms that utih7j-, clad monitoring system as the primary tank overfill warning device-(71.a, no <br /> N/A mechanical overfill prcvoutron valve is installed), is th:!overfill warning alarm visible and 3udihle at the tank <br /> _ fill oirtt s and o ratin* capacity trigger? <br /> _ /o <br /> p ( ) pc: �,ptuperly. If so,:at what pct-cont of tank is )cit dues the alarm tri t <br /> ElYcs* [.,ZNo Was any monitoring equipment replaced? If'yes, identil"y specific scissors,probes, or other equipment replaced <br /> and list the manufacturer name and mode) for all replUcrnent parts in Section E.below. <br /> 1.,1 Yes* No Was liquid found inside any secondary containrnent syatcrns designed as dry systems? ((:'/rack ull that apply) <br /> ❑Product; ❑ Water. Tfyes,_describc causes in Section C.below. <br /> U No* Was monitoring sygtern set-up reviewec)to ensure proper settings?Attach set up reports;,if applicable —� <br /> Yes ❑ No" 13 all monitoring equipment Operational per manufacturc:s's specrfications,f <br /> " In Section 14'below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: _-. <br />