My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) Site: -64e taco•-� <br /> Date: L; / b / b , <br /> NOZZLE 20 CFH 60 CFH 100 CFH PASS/FAIL NOZZLE 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> (.15" Water) (.45" Water) (.95" Water) (.15" Water <br /> (.45" Water) (.95" Water) <br /> o6 <br /> 'f ,o6 26 S �a55 f <br /> 7 oS 30 b ` Aq <br /> **See Long Form Test Report for Wet Failure Testing Blockage Tester Integrity: _ <br /> LIQUID REMOVAL CHECK k•Zo " W.C.@ 5 minutes <br /> --- — ----- -- <br /> D _ml g D/2 S ml D%rrtl D/ mI ID/ ml D/ mil D/ mL -- D/, mt D/ ml <br /> D _ml 6 p) ml D/ �rrii D'/ ml `i/' D/ ml D/ mi` D ml D p my-/ D/ mi <br /> tn1,_ )� _m1 / D/",- ----- D/ ml D/ mi D/ mi- <br /> JD/15 <br /> l D/I5 ml D ml D/ mlD/ ml D/ m1 I ID/ m1 D/ mi D/ ml D/ ml <br /> X Job Complete Repairs Done to Pass Test: <br /> Not Complete Repairs Still Needed: <br /> Parts: None Drop Tube Orings Fill Adaptor Gaskets Hoses Whi Hose <br /> I I Nozzles p qt, Breakawa s 5bo PV Valves Others: <br />
The URL can be used to link to this page
Your browser does not support the video tag.