My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rocha Food & Fuel 2185 E. Fremont St. Stockton, CA 9 .405 (SR0054375) <br /> list). The component must bear the appropriate mark as required by the <br /> independent testing organization. <br /> 5. Any changes in information and scope of work must be submitted to EHD for <br /> approval prior to commencing work. All new addenda supersede the previous <br /> ones. <br /> 6. Contact Aris Cacapit to arrange the following inspections (a 48 hour notice is <br /> required): <br /> a. One hour hydrostatic test (or equivalent) on the 91 spill bucket. <br /> b. Verify the five gallon capacity and drain valve operation of the 91 spill <br /> bucket. <br /> c. 87 LD functionality test(3 gallon per hour at 10 psi leak test). <br /> 7. If concrete is broken near the UST, a third party tank integrity test and/or line <br /> integrity test(or equivalent)must be performed, once concrete is poured in <br /> accordance with the manufacturer's guidelines. Results must be received by the <br /> EHD within seven days of returning the facility to operating condition. <br /> 8. A "Certificate of Compliance for Underground Storage Tank Installation Form C" <br /> shall be submitted by the owner or the owners' agent [pursuant to (CCR) 2635(d)] <br /> before this repair will be considered complete by the EHD. <br /> If you have any further questions, please contact me at(209)468-3453, fax to (209) 468- <br /> 3433 or email to acacapit@sjcehd.com. <br /> Thank you, <br /> Avs o,4 <br /> Aris Cacapit <br /> Environmental Health Specialist <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.