Laserfiche WebLink
Sunday, June 15, 2008 8:08 AM HMC- Henderson Maint Co (209)465-4988 p.04 <br /> Exhibit 2, Page 6 Executive Order VR-101-E <br /> Phil-Tite Phase I EVR Vapor Recovery System <br /> Figure 2A <br /> Typical Product Side Installation Using Phil-Tirte System <br /> Spill Container Lid <br /> Dust Cap <br /> Ph11�Tlte nosptor SW F:-I00 <br /> Cast in concrete or <br /> 4"min.for 95000 3crics attached to oontainmcnt <br /> 1"rain.for 45000-1 Serle; lid <br /> Largo Buna Seal <br /> I <br /> Stainless Sloe[Sleeve Phli-Tete Spill Cuntairter <br /> 1.Ac:hicves S gallon cnpacrty. <br /> 2.Allows removal or installation of - <br /> Pclrthant?Sial <br /> container without ground breaking <br /> or lid disassembly. <br /> __Outer FKM O-ring ror rlsvr tulip tri <br /> spill bucket interface <br /> Riser Tube. <br /> Drain Path into drop tubef rleUtittrtr Sftml <br /> Palethanp Drop Tube Seal Phil-Tito Riser Adaptor MUF4X4 <br /> Achieves square,flal Sealing Surf�r� <br /> Threaded 4 inch Tank Riser <br /> Tank Bunq <br /> Phil•Tite 61 SO-PT Overfill <br /> Prevention Device <br /> (01.3VONAI) <br /> Bottom of drop <br /> Drop tube openirlO lube should be cut <br /> must be submerged on 45 degree <br /> Where liquid Irwr,l is 5" angle <br /> deep <br />