Laserfiche WebLink
Sunday, June 01, 2008 4:26 PM HMC-Henderson Maint Co(209) 465-4988 p.02 <br /> Exhibit 2, Page fi Executive Order VR-101-E <br /> Plill-Tito Phase I CVR Vapor Recovery System <br /> Figure 2A <br /> Typical product Side Installation Using Phil-Tite System <br /> Spitl Container Lid <br /> Dust Cap <br /> " Phil-rite Adyptor SM-10013 <br /> Cast 1n concrete or <br /> 4"rilin,for 85000 series t atlached to containment <br /> 1"min.for 85060-1 sprica lid <br /> Large tuna Seal <br /> Stainless Steel Sleeve II I ISI Il ; Phil-rite Spiil Container <br /> 1.Achieves!)gallon capacity, <br /> 2.Allow,rrmovai or insLallation of , I� I Pelethane Sial <br /> conleiiierwithout ground breaking ! I' <br /> or lid disassembly. <br /> _ Outer FKM O-risug for nisei tubr. lu <br /> �'', — spill bucket interface <br /> RIsPr Tubi r <br /> urain path Into drop tubaL `pp. Pelethane Seal <br /> Palethane Drop Tube Seal I' I1- -Phil-1 tte Kiser Adaptor M/F-4X4 <br /> Achieves square.Flat sealing surface <br /> 111 <br /> Threaded 4 inch Tank Riser <br /> ,I <br /> P <br /> Tank Clung <br /> I <br /> Phil-Tlta 8.150-PT overfill <br /> Prevention Device <br /> (OPTIONAL) <br /> Bottom of drop <br /> Drop tube opening lube should be Cut <br /> must be submerged on 45 decree <br /> when liquid 1vvPI is 6" angle <br /> deep <br />